|
27th September 1862, Page: 5, Column: 6 Wearmouth CollieryThe operations for the recovery of the bodies of the men killed by the late accident are progressing steadily, though the difficulties to be encountered render the work necessarily very slow. The tubbing has been completed, and the sinkers are new engaged in removing the rubbish. Owing to the obstacles which presented themselves from the pieces of timber, chain, &c, which were mixed with the debris, the men were only able to remove two feet during the whole of yesterday, and it is entirely a matter of speculation when the bodies will be recovered. On Monday morning an accident occurred, though not attended with any serious consequences. The "crab" rope by which the cradle is suspended, was found to be too short, and for the purpose of attaching several fathoms more wire-rope, the cradle was detached and hung by chains to a batten, the ends of which were fixed into the sides of the shaft. The sinkers were at bank, and the wire-rope was being lowered by the "jack" rope, when the latter gave way, and the wire-rope fell upon the cradle, carrying it down by the weight. The cradle was afterwards found at the top of the debris uninjured by the fall.
|
|||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||