|
26th June 1862 NewsA new iron ore pit has commenced working at Collier Zeat, Lamplugh. Boring has been going on for some time, and the company, who have now started the pit, are very sanguine of the presence of metal in large quantities. A steam engine and boiler, and winding and pumping apparatus erected, with pit head, frame and gear have been obtained. The engine is of the horizontal type, of 20 horse-power, with all the latest improvements in piston, valves, &c. All the moving parts are made of scrap iron, and semi-steel, working in gun-metal bushes, and finished bright. The boiler is of Cornish description, with in-side tube and fire-place, fitted up with every apparatus necessary to render the working safe, economical, and durable. The gearing is similar in design to that usual in usual works of this kind, and is strong and substantial. When first set to work the whole moved on to the entire satisfaction of every one present. The whole of the work was executed at the Corkickle Engine Works, the designs, as well as those for mason and brick, being prepared by Mr. G. Forsyth.
Newspaper transcript kindly provided by
|
|||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||