|
28th February 1862 Letters to the EditorSir, — I see by the paragraph that appeared on the 14th inst., that it is there reported that Kepier pit had been worked 21 years with only one way out. Now, Mr. Thwaites ought to be quite well aware that when he entered into partnership with the late lamented owner, the first thing that the latter did, in 1840, was to sink a new pit down to the Hutton seam on Kepier Haughs, which was nine fathoms deep ; and then again, in 1842, he opened another old pit out in Kepier wood down to the Hutton seam, which was only five fathoms and two feet deep ; so that there were three ways out of Kepier colliery, and these old pits were kept open until 1857, when we abandoned and gave over working the Hutton seam of Kepier colliery. We then started to work the low main coal, 15 fathoms nearer the surface. It was then my late master's orders to drive a pair of places away due east, until I came to the trouble, and then to go north for 400 yards, to an old pit shaft that was filled up a few years before, as it was his intention to open the old shaft out, so as to make two ways out from the low main workings ; but in March, 1858, he was suddenly called from amongst us before it could be accomplished. For whilst the colliery was in the possession of the executrix of my late master I tried the plan laid down by him to get two roads out, but the first place I tried, going north, I was forced to abandon, after driving 350 yards, as I found that where the Hutton seam had been wrought in the broke there was no chance of getting through that way without a great deal of outlay. I then set this present drift away that there is so much controversy about in your paper of the 21st, and which has holed into Kepier Wood. "One who ought to know," says that is 1000 yards in length, driven through at a cost of £60, which is a small sum, something like one shilling and twopence per yard for driving through fallen boards and crept close workings. But I am glad to think that Mr. Thwaites was workmen who can put crept and fallen boards through so fast ; for I am quite well aware that when certain parties unnecessary to name wrough shift work under me, two of them were many a board 3 shifts a piece before they got it put over, that was 6 shifts at 3s. 4d per shift, or 20s for putting a four-yard board room over. "One who ought to know" gives Mr. Suggett all the praise for driving the drift through. Can he inform me how far the drift was in both of Kepier pit side and Kepier wood side on the 23rd June 1860? When Mr. Suggett took charge of Kepier colliery, was it not 350 yards in Kepier pit side, and about 20 yards in Kepier wood side? When I set it away, the full distance it had to go was 814 yards ; and let "One who ought to know" deny that it he can. If he calls upon me he can either see the surface plan or the underground plan of Kepier colliery, if he disputes my work about the measurement. Yours, Wm. Lumley Late Overman of Kepier Colliery.
|
|||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||