9th December 1854, Page: 5, Column: 3
Local And District News
The Sunderland Dock Company have deposited
plans for the formation of a graving dock, 360 feet
long by 80 feet wide, with an entrance into the tidal
basin ; also for the making of a slip, 520 feet long from
the gates to the top of incline, and 45 feet wide, with an
entrance into the present extension of the wet dock
The plans are prepared by Mr. John Murray, C.E.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| Murray, John | | Civil Engineer | |