Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

17th January 1851, Page: 4, Column: 3

The Eston Railway And The Cleveland Ironstone

The opening of the New Branch Line from the Middlesbro' and Redcar Railway to the recently discovered ironstone at Eston, took place last week. The inhabitants of Eston assembled, in their holiday garments, to witness the novel sight of a steam-engine and train running up to the very foot of the hills; as well as the descent of the first train of waggons laden with iron-stone down the incline. This incline is about 1000 feet in length, and the point at which the quarrying is commenced is about 400 feet above the level of the sea. There are two banks, dividing the incline; one of 400 feet, and another of 600 feet, worked with ropes of corresponding lengths. Up these banks the spectators ascended; a brass band leading the way, flags bearing appropriate mottoes preceding them. The beholders having arrived at the quarries, a signal was given, and six waggons laden with the ore were released, and rushed down the incline; in a few minutes, on the second line of rails, appeared six empty waggons hastening with a like speed towards the summit, the motive power being supplied by the descending waggons, which were attached by strong iron ropes. After some time spent in viewing the operations, the party returned to Middlesborough, where about fifty gentlemen sat down to dinner, at the Globe Inn, Mr. Bolckow presiding, and Mr. Vaughan occupying the vice-chair, Messrs. Hepple of Bishop Auckland, H. Pease, H. Hutchinson of Darlington, J. Wilson, F. Mewburn, Dryden, Jordison, and Marley, as well as the chairman and vice-chairman severally addressed the meeting. The iron-stone in Cleveland was discovered but a few years ago. During the last two years a considerable quantity has been worked near Huntcliffe, but the expense of beach lading and coast shipping has rendered it hitherto of but small benefit. The position of the strata induced Messrs. Bolckow and Vaughan and their engineers to believe that the seam would be found in the vicinity of Eston; and a few months ago Mr. Vaughan and Mr. Marley, their mining agent, in exploring the hills examined the earth which had been thrown up from the burrowing of a rabbit, and at about eighteen inches from the surface the iron stone was found. It is distinguished as the Skinningrove or Lofthouse bed. The ore (though Mr. Vaughan said it is not equal to some of the Scotch) is of excellent quality, yielding it is stated a minimum rate of 33½ per cent of iron, easy to work, and a very superior metal. The seam is found in some places within a few inches of the surface, and presents a face of iron stone extending from nine foot to eighteen foot in depth. A well-known mining engineer, of great experience in the district, has stated his belief that a single square mile of this ore would supply the whole of the furnaces of the west district for upwards of a century, and not be exhausted. The machinery just completed, is calculated to supply, it is understood, about 1000 tons of ore daily, a large portion of which is already contracted for by the Consett and other iron works. Contracts are being made for the weekly conveyance of two thousand tons of ironstone by rail into Weardale. The importance to the district of the discovery of such a field of mineral wealth is obvious. Within a few miles of the seaport of Middlesbro', connected by rail with it, and from thence, having by the Stockton and Darlington line such ready access to the coal field of West Durham, and thus such cheap facilities for smelting &c.; and having also (by means of the same line) railway communication with almost every part of the kingdom, such a fast bed of ironstone of such good quality must prove of immense benefit to the district and produce no small effect on the iron trade of the whole kingdom.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Bolckow, —    Mine Owner  
Dryden, —      
Hepple, —      
Hutchinson, H.      
Jordison, —      
Marley, John    Mining Agent  Whos Who Page
Mewburn, F.      
Pease, H.      
Vaughan, —    Mine Owner  
Wilson, J.      



Links to Collieries/Mines mentioned in this article

 

Eston (Ironstone)  Eston (Ironstone)
Huntcliffe (Ironstone)  Huntcliffe (Ironstone)


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print