Museum Entrance Museum Entrance
Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Colliery Guardian
Mining Journal
Mining Journal - Main Index
Mining Journal - Subject Index
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
February 6, 1909

Weardale Lead. — Week ended January 30: Boltsburn Mine. — Quarry Hazel drift extended 2 ft.; vein 2½ ft. wide, composed mainly of fluor spar mixed with a little ore. The flats continue large and productive, valued being well maintained. The number of workings throughout the mine has now reached thirty, giving an average value of 55¼ cwts. of ore per fathom. Engine sump deepened to 16 ft. below Quarry Hazel drift; vein 3 ft. wide, composed of fluorspar brangled with ore.

Wolfcleugh Mine. — 35 level driven 4 ft. in north branch of vein, which is rather nipped and poor, worth 12 cwts. of ore per fathon. The stope above this level is alos nipped, worth 14 cwts. per fathom. The understope shows vein still caryying hard stone in middle worth 14 cwts. per fathom. Stopes above drift shows vein 6 ft. wide, worth 16 cwts. of ore per fathom.

Stonehopeburn Mine. — North crosscut advanced 3 ft.; no change to note. The stopes in the vein continue wide and productive, yielding good fluorspar and some ore. A drift has been put through a middling westward, improving ventilation and opening up a large extent of ground in that direction.

Sedling Mine. — Water level extended 2 ft., no change to note. The stopes are producing about the usual quantity of fluorspar and ore. The forty-five workings throughout the whole of the mines give an average of 39½ cwts. of ore per fathom. Dressing and smelting returns satisfactory.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print