Museum Entrance Museum Entrance
Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Colliery Guardian
Mining Journal
Mining Journal - Main Index
Mining Journal - Subject Index
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
January 16, 1909

Weardale Lead. — Week ended January 9: Boltsburn Mine. — Quarry Hazel drift extended 6 ft.; vein 3 ft. wide, worth 12 cwts. of ore per fathom. Peart's crosscut south extended 4 ft. ; in a strong flat, worth 28 cwts. per fathom. There are a few changed here and there in the mine, but values on the whole remain the same as last week. The 29 workings give an average value of 54 cwts. of ore per fathom. The mechanical arrangements for continuing the engine sump are now completed.

Wolfcleugh Mine. — The 35 level extended 4 ft. in north branch of vein; worth 14 cwts. of ore per fathon. Stope above the 35 level worth 30 cwts. per fathom. Stope below worth 32 cwts. per fathom. The stopes beinf the Vein drift forehead are worth 16 and 12 cwts. of ore per fathom respectively.

Stonehopeburn Mine. — North crosscut driven 3 ft.; no change. The three stopes above the drift show a vein from 12 to 16 ft. wide, composed of fluorspar and a little ore.

Sedling Mine. — Water level extended 2 ft.; the end continues in hard vein rider. The stopes, both at Water level and 35 level are a little poorer in ore, but maintain their yeild in fluorspar.

The 44 workings throughout the whole of the mines give an average value of 38 3.5 cwts. of ore per fathom.

Dressing and smelting returns satisfactory.

Four weeks ended January 9: Ore raised, 357 tons. Pig lead smelted, 254 tons 17 cwts. Average price obtained for pig lead sold, £12 13s. 6d. per ton net.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print