July, 1954 Swinburne QuarryIn this brief description of this Northumberland property of the Amalgamated Roadstone Corporation Limited, particular mention is made of the milli-second delay blasting used on the face to give excellent fragmentation, while details are given of the new 45 t.p.h. coasting plant and improved dust control methods.In recent years the Amalgamated Roadstone Corporation Ltd. have been carrying out extensive modernisation of their roadstone plants for the purpose of stepping up output to meet a rapidly increasing demand, without increasing the costs. Their many quarries throughout the country have been developed into completely mechanised units from the face operations through to the final stone product. This quarry began producing whinstone penning for road material as early as 1932, using manual methods and having a limited output. It has since been progressively mechanised and at the present stage of development is capable of an output in excess of 600 tons of crushed stone per day. The stone worked is termed locally whinstone, which is a dark, compact igneous rock of the basalt type. Quarry face working Compressed air for the quarry face drilling is provided by three stationary compressors having a total delivery of 500 cu. ft. per min. of free air. Of these machines two have been supplied by Broom and Wade Limited and are a model EH 240 (delivery 250 cu. ft. per min. and powered by a 50 h.p. motor) and a D 22 (130 cu. ft. of air per min., 30 h.p.); the third machine is a Lacy-Hulbert DV 2.5, rated at a free air delivery of 120 cu. ft. per min. and driven by a 30 h.p. electric motor. A 5 in. main connects the compressors with the three interconnected air receivers which have a total capacity of 225 cu. ft., and a 4 in. air line distributes the air to the quarry drills. For accommodating the explosive, both vertical and horizontal holes are drilled. The vertical holes, of 2½ in. diameter, are sited to give an approximate burden of 14 ft., while a lateral spacing of 9 ft. is generally adopted between adjacent holes. These are drilled by a Climax wagon drill to a depth calculated to align the bottom of the hole with the quarry floor. Tungsten carbide insert bits are used in conjunction with rods supplied by Sheffield Hollow Drill Steel Co. Ltd.; the rods used are 5 ft. in length, and threaded at either end so that they may be joined by a sleeve coupling, while special adaptors are used for connecting the rods to both the bit and the drill. At the present time, horizontal holes, 1 7/8 in. in diameter and approximately 14 ft. in length, are being drilled at the foot of the face to bottom theoretically in between the foot of the vertical holes. These holes are drilled with a Climax 10 Mark II Maxleg combination. However, tests are being made to see if these horizontal holes can be eliminated by chambering the bottoms of the vertical holes so that they may accommodate up to 35 lb. of explosive ; this will enable a concentrated charge to be placed at quarry floor elevation. The chambering of the hole is achieved by lowering and detonating successively larger explosive charges until the necessary amount of springing has been done and a suitably-sized cavity obtained. Of interest in connection with the drilling of the horizontal holes is a portable shelter used for the protection of the drill operator. Seen in Fig. 1, this shelter comprises a steel structure with a roof of 3/8 in. mild-steel plate, welded, and strengthened by rolled steel joists. It was designed by Welding Construction and Repairs Limited, London S.E.7, in conjunction with Ruston-Bucyrus Limited to the requirements of the quarry management and built to support a load of 80 to 100 tons. It is interesting to note that this shelter when in use has actually withstood the fall of a ½-ton boulder without any illeffects. A further feature of its design is that it may readily be picked up and moved by a 24-RB excavator when it is desired to change locations. Primary breaking of the face, which averages 80 ft. in height, is achieved by using milli-second delay blasting methods; this form of firing has been found to produce a well-fragmented pile of broken rock of a size convenient for handling by the two loading excavators (see Fig. 4) and feeding to the primary jaw crusher. Very little secondary breaking has been found to be necessary, as about 95 per cent. of the rock after a primary blast is less than 36 in. in size and, therefore, suitable for immediate handling. Blasts of 50,000 tons have been achieved on this face; on these two pages we reproduce photographic prints taken from a movie film of one of the smaller milli-second delay blasts, and these are of interest in showing the various stages from initiation of the first hole to the end product pile of broken stone of uniform size. The quarry management have worked on this blasting technique in close collaboration with the Nobel Division of Imperial Chemical Industries Limited who supplied the detonators and explosive employed. When it becomes necessary to drill pop-holes for breaking large boulders, a number of hand-held machines of Consolidated Pneumatic manufacture are available. Gelatine dynamite high explosive is used for charging the holes, the vertical ones being loaded to within ten feet of the top and stemmed with dust. The milli-second delay detonators are located approximately 1/3 of the depth of the hole from the top and a Cordtex lead extends down to the primer cartridge. It is claimed that with the use of the milli-second delay form of blasting the full power of the explosive is effectively used to fragment the rock; because of the small delays between individual shots detonating, each column of rock broken receives successive "blows" from adjacent detonations while it is moving out from the face and before it falls. The effect of this may be judged from the series of photographs reproduced here. With this well-fragmented rock pile, the work of the two Ruston and Bucyrus 24-RB excavators used for loading is made considerably less and wear and tear on the machines reduced to a minimum, while a better hourly output can be achieved when handling a fairly uniformly-sized product. Stone is loaded into three Dodge tipping lorries, each of which carries 5½ to 6 tons of stone in a specially reinforced body made up locally to the specifications of the quarry management, and conveyed to the chute where the stone enters the treatment plant. Crushing and screening plant Stone from the quarry face is brought to the primary crusher house where it is tipped and fed by chute into a 20-ton hopper. Retaining chains are fitted to prevent overfeeding to the 36 in. by 72 in. Locker-Traylor shaking grizzly responsible both for feeding the primary crusher and eliminating quarry dirt from the circuit. The grizzly bars are adjustable so that different settings may be employed for summer and winter operation, these being ¾ in. and 1 in. respectively. The primary crusher is a 36 in. 24 in. Baxter jaw and one of the advantages of the milli-second blasting shows up here in that throughputs above normal are usual. The discharge is conveyed on a 30-in, belt to the secondary gyratory crusher, a Kennedy No. 12, which reduces the stone to approximately 3 in. in size. It may well prove of interest to readers to have details of a recent repair to the casing of this crusher carried out during the Christmas 1953 holiday by Metalock (Britain) Limited. The bottom shell had sustained a 5 ft. fracture due to a digger tooth getting in the crusher, and before commencing the repair it was necessary to have the casting clamped to regain alignment, this being carried out by the quarry staff by shrinking a steel band around the top perimeter of the fractured shell. The repair was then commenced by the application of a Masterlock which is a rectangular block of special high tensile alloy around the perimeter of which runs a series of half round holes matching up with opposite numbers already machined in the parent metal (see centre diagram Fig. 5). This block was sunk flush into the top face of the shell transversely to the fracture, this section of the casting being 4¼ in. thick. The resultant full holes were then filled with short alloy dowels which were driven home and cold worked pneumatically. This "Masterlock" is claimed to serve as a shock absorber as well as replacing the strength in this thick section. The rest of the fracture which extended down the wall of the shell was fitted with a series of Metalock keys (left, Fig. 5) by means of a jig through which lines of blind holes were drilled transversely to the fracture. These pilot holes were then opened out to size, the casting at this section being 1½ in, thick. The channel of metal in between the holes was removed by means of special hand-operated pneumatic tools, the result then being a series of holes connected by parallel sections into the aperture thus formed. "Metalock" keys were thus driven one after the other in layers and peened into the parent metal. The alloys from which the keys are produced have a known tensile strength and the correct number of keys used to restore the original strength is a matter of close calculation. The fracture between the keys was then drilled and tapped to receive "Metalace" (right, Fig. 5) studs in addition to the locks. After the lacings were inserted the whole repair was then cold worked to ensure perfect tightness and rigidity and the full surface of the repair was then ground flush. This repair was carried out on site by two operators of the Metalock Repair Service in 63 hours with no loss of production time and the crusher is still operating satisfactorily. Stone from the secondary crusher is conveyed by a 24-in, belt to a scalping screen equipped to make a separation at 2½ in. for feeding the two tertiary crushers. Oversize is directed to a 3 ft. Symons Shorthead cone, adjusted to a 5/8 in. setting, while the undersize is passed to a No. 3 Kubit impact breaker manufactured by Frederick Parker Limited. The discharged stone from both crushers is passed to a common 24-in, conveyor belt which takes the —2 in. material to the screening building via a transfer house. In the screen-house are located Pegson, Locker-Titan and Locker-Traylor screens from which eight specific sized products from -1½ in. down to dust are made and passed by gravity to a battery of storage bins, of 700 tons total capacity; this may be seen diagrammatically in the flowsheet shown as Fig. 3,from which it will be noted that the initial screen rejects are returned to the Nordberg cone crusher. Provision has been made for drawing off stone from the five bins containing the sizes 1½ in. to +¼ in. and recirculating to the Parker crusher for "Kubitising." A further set of four bins are occasionally used, these being supplied from a shaking screen. Feed to this screen is taken from a point between the secondary crusher and scalping screen where a deflector plate is fitted and adjusted to take off a percentage of the normal feed. This —3 in. stone is sized into +3 in., 2½ in -1¾ 1½-¼ in., and dust, and material from these bins can also be returned to the Parker breaker. The level of material in each of the twelve compartments is shown by a signal panel linked to Redler bin indicators seen in the upper right of Fig. 7, while a duplicate panel is installed in the main office. Coating facilities No. 1 coating plant, which was installed several years ago is capable of producing 35 t.p.h. Stone as required is collected in a travelling weigh hopper and is discharged on to a conveyor and taken to the rotary dryer. Dried material is then elevated to a check weigh hopper from which it passes to a 27 cu. ft. Dawson Fawcett mixer. Liquid binder is drawn from a bank of three 3,500 gal. Clarmac storage tanks, heated by electrical immersion units which are thermostatically controlled to maintain a binder temperature of 150-300° F. The new layout for coating plants was designed and first used at Greenwich in 1947. After a period that proved its operational efficiency a similar layout was adopted for Blodwell in 1950, Cleehill in 1951 and Swinburne in 1953. As part of the latest development No. 2 coating plant, supplied by Stothert and Pitt Limited, was installed for the production of coated macadam for road surface-dressing. Aggregates are batched from the bins, stone being drawn from each as required by means of an automatically-operated motor driven grader (see Fig. 6). The grader consists of a four bladed paddle rotating inside a housing and fitted at the bottom of each bin so that it is fed by gravity. The grader is driven by a 2 h.p. motor with an integral gearbox to give the low paddle speed required. Since the amount of stone delivered depends upon the number of revolutions of the paddle, by means of automatic control a given quantity of different sizes of stone can be delivered on to a belt conveyor for transmission to the coating plant or alternatively loaded, as dry graded stone, to road transport. The principle of the system is to control each grader motor so that it runs for a predetermined number of revolutions which will deliver the correct amount of material for a particular batch. Each of the grader motors is switched in and out automatically as required to produce the appropriate quantities of different grades of stone in each batch. With this arrangement the material can be graded automatically and accurately into 40 cwt. batches to meet different British Standard specifications. Once a grading has been established correctly it is maintained consistently for as long as the grader is handling that particular sized product. The system is controlled by contactors for switching the grader motors on and off, and a control unit that switches the grader motor contactors in and out according to the quantities and sizes of the material required in each batch (see Fig. 7). The control unit consists of a motor-driven camshaft with cams designed to engage contactor-closing contacts for set periods of time that provide for a predetermined number of revolutions of the grader motor. To allow for the different stone specifications that may be required there are a number of camshafts available, each of which has an arrangement of cams corresponding to a particular grading of material (see Fig. 8). Each camshaft is inserted into the control unit as required, after which pressing the "start" push-button initiates the sequence of operations of the graders to make up the batch of the material required. A series of pilot lamps on the left of Fig. 8 indicates to the operator the progress of the automatic sequence so that if anything goes wrong it will be noted immediately. When a batch is made up the camshaft motor is switched off automatically, until the operator presses the push-button to start the next grading operation. Alternatively, the graders can be operated individually by push-buttons under manual control to allow for selective grading of special batches. The camshaft type of control unit has the advantage of being simple, completely reliable, and easy to maintain. The batch of dry stone is conveyed either directly into lorries or to the hopper of the batch heater, which has a capacity of 45 tons per hour. In Fig. 9 this hopper may be seen in the top left-hand corner. Stone is then passed into the oil-fired batch heater. The drum is rotated by a 20 h.p. slip-ring motor while a 7½ h.p. squirrel-cage motor drives the compressor supplying air to the burners which use Shell 200 secs. Viscocity fuel oil. On the extreme right is a control panel for the electric graders which enables the operator to check on the operation and stop the process if necessary. Industrial broadcast communication links this operator with the mixer floor, and the arrangement will be extended to other sections of the plant. The heated stone is discharged into a skip hoist bucket and carried up to the mixer, Fig. 10, where it is first check-weighed before being transferred to the mixer together with weighed quantities of dried filler, if required, and tar or bitumen which is also weighed. Three Clarmac 6,000-gal. binder tanks as seen in Fig. 11 and of the same type as used in the No. 1 coating plant, are thermostatically controlled and incorporate a further refinement of time-control switching. The 36 cu. ft. Stothert and Pitt mixer is driven by a 50 h.p. slip-ring motor. During mixing the batch is maintained by means of electric heaters at a temperature to ensure a complete and effective coating, while the length of mixing time is naturally governed by the type of coated material being produced. Both heating and mixing is controlled by Burrell time clocks. The material after mixing can be discharged direct into lorries or storage bins to await the arrival of the lorries (see Fig. 12). Dust suppression During the last stage of development of the Swinburne plant dust control equipment has been installed throughout. Its effectiveness is illustrated by the comparative photographs shown in Fig. 13. The two methods used for the control of dust have done a great deal towards improving working conditions. With the first, dust from the two tertiary crushers is controlled by a wet precipitator (Fig. 14), manufactured by Filter Heat Limited. With this, dust-laden air is drawn through a number of water blankets before being exhausted to atmosphere. The second system is a liquid dust suppression system applied at the primary and secondary crushers using a patented liquid wetting agent mixed with water. This equipment was supplied by the Johnson-March Corporation, U.S.A., and is seen in Fig. 13. The principle of action is that a wetting agent breaks down the surface tension of the water when it is in contact with a solid, and the mixture is sprayed in minute quantities in a finely atomised state, on or in the vicinity of the material which is being treated. Thus it is possible to lay dust at conveyor heads effectively without having to wet the stone. Power Electricity supply is taken from the 20 kV overhead line of the North Eastern Area Electricity Board and stepped down by a 500 kVA transformer to 440 V for the main distribution. Three distribution feeder cables are controlled by three metalclad switchgear units equipped with oil circuit breakers of 300 A normal capacity and 20 mVA breaking capacity. Fig. 16 shows the new switchgear installation. This switchgear was installed to replace obsolete switchgear and provide an additional 440 V feeder to distribution circuits for the electrical equipment of the new plant in stalled during the final stage of the last development scheme. Crompton Parkinson Limited were responsible for supplying the cables, "Klad" medium voltage switchgear and electric motors; and their Contract Department engineered and carried out the electrical installation in association with the North of England Engineering and Electrical Co. Ltd. The electrical installation work involved in the recent mechanisation work included the re-wiring of existing equipment in the plant generally, and of the water service plant and the maintenance workshop. Testing The whole of the plant has been set out with thc object of producing all materials to British Standards specifications, and to ensure that these standards are maintained regular checks on materials are made. The various sizes of dry stone are checked by sieve tests, while coated stone samples are regularly sent to the Amalgamated Roadstone Corporation's central laboratory at Chipping Sodbury where the binder content and material grading is carefully checked, and a report issued. The Corporation also operates a mobile laboratory, which is available for sending to the various quarries as required. The normal procedure is for this laboratory to be stationed at a particular quarry either where operations are being started, or where a new coating plant is being put in. Two interior views of this mobile laboratory are shown above in Fig. 17. Acknowledgments We are indebted to the directors of the Amalgamated Roadstone Corporation Limited, for permission to publish the information and photographs in this article. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||