|
West Allendale West Allendale was a more productive field than East Allendale, and although there was no active mining for many years (in contrast, for example, with the modern workings of Sipton), some prospecting and development were done before the war by the Vieille Montagne Zinc Company. Kiersleywell (No. 19) was an adit which, started by the Beaumonts in 1729, worked until 1789. Attempts at revival were then carried on from 1816 to 1830 and 1847 to 1853, but only produced 597 tons of concentrates. Mohopehead (No. 4), another adit, between 1729 and 1878 produced 4,200 tons of concentrates. Wellhopehead (No. 7), at the head of the Nent Valley, another drift working, appears to be of quite ancient origin. On the Northumberland side of the West Allen the most interesting mine is Coalcleugh (No. 14), where the earliest workings on the Low Coalcleugh Vein were from shallow shafts. Later a prospecting level, Coalcleugh Level, was driven to the High Coalcleugh Vein and cut it at 2,500 ft. from the portal. About 1760 the Barneycraig Horse Level (No. 13) was started and driven for over a mile, giving access to the working of the Barneycraig Vein which came into production between 1808 and 1823. Several other veins were worked in Coalcleugh and Barneycraig, and among them were a number of flats. These two mines were worked by the Beaumont Company from 1729 to 1878, in which period 187,924 tons of lead concentrates were produced, besides 31l tons of zinc concentrates between 1874 and 1880. The mines were taken over by the Vieille Montagne Company in 1899, and between then and 1920 the production was 6,687 tons of lead concentrates and 52,566 tons of zinc concentrates, with a silver yield averaging 8 oz. per ton of lead. Coalcleugh Mine has recently been reopened for the working of fluorspar, and a new company, the Allendale Metalliferous Mining Company, has been formed for this purpose and for the exploration of 9,000 acres of moorland. Nentsberry Mine (No. 7A), although partly in Cumberland, should be considered as belonging to this field as its workings extend into the Wellhope area of Northumberland (not to be confused with the Wellhope in Durham). Access was originally through Nentsberry Haggs Horse Level, but a shaft — Wellhope (No. 6) — was sunk in 1925, connecting with the level at a depth of 416 ft. The Vieille Montagne Company took the mine over in 1913-14 and did a great deal of development which led to the discovery of rich oreshoots of average width 6-7 ft., with such individual widths as 20 ft. and 12 ft. Between 1923 and 1928 a total of 277,657 tons of crude ore was extracted, yielding 33,998 tons of lead concentrates containing 80 per cent, lead. Nearly all the ore was treated at Nentsberry mill; difficulty was experienced in separating blende and witherite, and there is still ore of this type left in place. The Non-Ferrous Minerals Development Control (Ministry of Supply) in 1942 established the existence of 54,000 tons of this ore averaging (in percentages) 8.75 zinc, 1.5 lead, and 13 barium carbonate, over widths of 5 ft. and 8 ft. Between 1913 and 1938 Nentsberry production was 39,251 tons of lead concentrates and 4,152 tons of zinc concentrates, with 6.5 oz. of silver per ton of lead. Durham: Weardale The earliest definite evidence of lead-mining in this area is Norman. During Norman times Weardale was the property of the Bishops of Durham, and according to the Durham archives King Stephen, in 1135, granted the Minariam de Weredala to Hugh Pudsey, who was bishop at the time. This phrase implies that lead-mining in Weardale was already established; the bishopric had its own mint, and no doubt used silver from the lead. While Cardinal Wolsey was Bishop of Durham he made a valiant but unsuccessful attempt to "melt and try lead with sea-coals" at Gateshead, and in 1527 granted a lease of his furnaces and all his mines in Weardale for thirty years at £5 a year. This sum was paid annually for over a century. In 1696 the mines were leased to the Blackett family, and the ore was smelted by the London Lead Company. At the beginning of the nineteenth century the company leased a number of the mines while the others were leased by Colonel Beaumont, and in 1809 the mines were producing sufficient ore to keep three smelters going. Records name Breckonsike and Wolfcleugh as among the richest mines, the former having produced 4,000 tons of ore in one year, but there is little evidence supporting the alleged prosperity of Wolfcleugh. In 1821 there were 36 mines working in Weardale, and the total production was 6,800 tons. The Ecclesiastical Commissioners took over the ownership from the Bishopric in 1836. Breckonsike Mine workings (No. 52) were reached from an adit, and the vein was that worked in Allenheads Mine in Northumberland. Originally the Breckonsike Vein was worked opencast, and a sample of fluorspar from the dumps averaged 88.4 per cent. calcium fluoride and 5.05 per cent. silicon dioxide (Imperial Institute, 1941). In 1929-30 a little dump material was taken, but inaccessibility made it uneconomic. Production of galena from 1836 to 1878 was 5,852 tons, but by then the workings were connected with Burtree Pasture Mine, which principally worked the Burtree Pasture Vein and which produced, between 1818 and 1890, about 175,000 tons of concentrates. Wolfcleugh Mine (No. 32) may have had a wealthy past, but in the recorded period of Beaumont operations, between 1818 and 1846, there is only evidence of 325 tons of galena. The Weardale Lead Company reopened the mine in 1901, and up to 1912, when it was abandoned, succeeded in producing 3,400 tons of fluorspar and 1,639 tons of galena. The company made a further attempt in 1946. One mine which has worked successfully within comparatively recent years is Boltsburn (No. 38), which for a time was the most important producer of the Weardale Lead Company, owing to the prolific production afforded by the capacious flats. These flats, extending over a distance of two miles, up to 200 ft. in length, 50 ft. in width, and 10 ft. in depth, kept the mine going until 1932, when it had to be closed down on account of increased haulage and winding costs. Sedling Mine (No. 53) was originally worked primarily for lead, and from 1818 to 1878 the Beaumont Company produced 10,411 tons of concentrates. The Weardale Lead Company produced 6,159 tons betWeen 1889 and 1938, but long before that the galena content of the Sedling Vein had been decreasing with an increasing proportion of fluorspar thus, between 1900 and 1916 (according to Louis), the galena production, 2,708 tons, was only about 4 per cent. of the total, the fluorspar production for that period having been 49,732 tons. From 1900 to 1940 the total fluorspar production was 145,477 tons, and a small, modern, well-equipped mill came into operation. Two mines which have been reopened in recent years for the production of fluorspar are Stotfield Burn (No. 39) and Stanhopeburn (No. 42). Stotfield Burn was developed by the Rookhope Valley Mining Company between 1863 and 1884, access following the customary pattern of a main shaft with an adit level. Since 1914 work has been fairly regular on the whole, except for intermissions before 1929. The mine is being worked by the Weardale Lead Company, and Dr. Dunham gives the following production figures: lead concentrates, 1863-82, 1,808 tons, and 1932-40,104 tons; fluorspar, 1905-40, 15,168 tons. The neighbouring property, Stanhopeburn, was worked by the Earl of Carlisle & Co., in the eighteenth century, and in the nineteenth century the lease passed to the London Lead Company. The Beaumont Company took it over in 1866 and abandoned it in 1875. In 1906 it was reopened by the Weardale Lead Company, who worked it with some success till 1933. Messrs. Beaston & Elliott again reopened it in 1937, and in 1941 it was acquired by Fluorspar Ltd. Apart from recording that the Weardale Lead Company opened a new central mill at Rookhope in November, 1949, and is now developing newly discovered veins at Rookhope and Cowshill, we can afford no more space on the Weardale mines, of which, as will be seen on the map, there are, or were, a great number, even though Westgarth Forster lists only seventeen. Durham: Teesdale Although there were mines on the Yorkshire side of the Tees, the most productive area was on the northern side, west and north of Middleton-in-Teesdale, where the Whin Sill makes its most southerly appearance at the waterfall known as High Force. The number of mines listed by Westgarth Forster in Teesdale is about correct — ten worked by the London Lead Company and eighteen by minor companies. The London Lead Company was active in the area from 1752 to 1904; there are no figures for the years before 1816, but from then until 1851 the company produced 122,420 tons of lead concentrates. After 1851 the figures for individual mines are available. Barytes was a useful by-product of this district until recent years, when, like fluorspar in the more northern dales, it practically ousted lead ore and became the main product. Greenhurth (No. 82), one of the most celebrated of the mines, had a chequered history from 1799 to 1868, when it was taken over by the Greenhurth Mining Company which, until the final closing-down in 1902, produced 18,240 tons of lead concentrates, 21 tons of zinc concentrates, and 25 tons of barytes. The deepest shaft was about 500 ft., and assays of the tailings dumps have shown that extraction was efficient. Cowgreen Mines (No. 116), comprising a number of shafts and adits working several veins, were originally abandoned in 1835, but from 1855 onwards passed through different ownerships. Production periods were divided into the stages 1855-71, 1876-81, 1886-95, and 1898-1920, and the last period embraced the production of Dubbysike Mine (No. 91), 1¼ miles to the north-west on Herdship Fell. In all, 701 tons of lead concentrates was produced (with a silver content of 4.4 oz. per ton of lead), but since 1886 the main product has been barytes, of which the production up to 1920 (chiefly under the Hedworth Barium Company) was 59,123 tons. The Anglo-Austral Mining Company took over the property in 1935, installed modern mining equipment and a mill, and according to Dunham had produced nearly 120,000 tons of barytes by 1945. The entire finished output is used in the manufacture of lithopone, and although in 1939-40 run-of-mine ore averaged 65 to 70 per cent. barium sulphate, treatment of ore with less than 40 per cent. has been found economic. The Coldberry group of mines (No. 103) was originally worked by the London Lead Company. Coldberry itself produced 45,059 tons of lead concentrates, yielding 3 oz. of silver per ton of lead, from 1852 to 1902, and Red Grooves produced 10,110 tons from 1852 to 1886. After the company surrendered its leases various concerns became interested, but between 1907 and 1912 only 59 tons of ore was produced. The group was explored by English Lead Mines Exploration Ltd. in 1938-39, and although on the whole there seems little likelihood of a future on those veins which were worked, development on other veins has indicated a proved reserve of lead ore in place. The Coldberry Lead Company was registered in 1946 and is still in operation. Other war-time work carried out in Teesdale included a survey of the Ettersgill zinc deposit, undertaken in 1941-42 for the Ministry of Supply by Non-Ferrous Minerals Development Ltd. Prospecting included diamond drilling and the driving of an inclined drift for 760 ft., and the total zinc content was found by sampling (mainly done by Mr. J. D. Willson) to be 10 per cent. Mr. L. A. Wood and Minerals Separation Ltd., showed that a high-grade zinc concentrate could be obtained by flotation. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||