Concentrate drying The finished concentrate from the flotation unit passes down a steel U-shaped launder to an eight disc American filter, of which three discs only are used. The discharge cake from the filter carries 4 per cent. moisture. This concentrate is sent to the bin by the same conveyor that takes the table concentrate. It is sold at the bin, and transported by road to the smelters. Mill water There is not much difficulty in securing water for dressing. Low pressure water is tapped from a stream flowing along the mountain side, and turned into a head tank some twenty-five feet above the mill. The overflow from the thickener is also re-used, the thickener feed consisting solely of water from the dewatering plant, overflow from the cone box and spillage from the mill floor. High pressure water for the head screen, pump glands and pressure hoses used for washing down the plant and for cleaning the mill floor, is taken from No. 2 Power Station turbine feed at over four hundred ft. head. Tailings disposal Representations have been made in the past to the company by various societies interested in the preservation of national beauty, regarding the discoloration of the beck which flows by the mine and feeds into Lake Ullswater. This necessitates all tailings and mill water being fed into a central sump whence they are pumped to a settling pond and dam. The overflow water from the dam runs to the Glenridding beck, and should be clear to satisfy the aforementioned societies. Lime is used as a flocculant and generally answers the purpose. Sulphuric acid was recommended for this purpose, but as the resulting discoloration, due to precipitated ferrous carbonate on the rocks, equally perturbed the societies, it was discontinued and only lime has been used since. Three hundredweights of lime are added per hundred tons of ore milled. The site of the dam is on a hillside nearby, one thousand feet from the mill buildings. The tails are pumped out along 4 in. pipes by a 5 in. Gwynne pump and a booster pump for the same type is placed in line circuit at the head of the dam. By this means the tailings are discharged through 2 in. pipes at the periphery of the dam, the coarse material settling out at the points of discharge to form an outer wall or lip. The water carrying the finer particles flows towards the centre of the dam to the weirs set above vertical concrete pipes, 15 in. in diameter, which connect with the main drainage pipe laid beneath the dam. The points of delivery of the tailings to the dam and the points of discharge of the overflow are so arranged as to give the maximum time to allow the fine particles to settle. The resulting overflow, which is clear, is carried by the main discharge pipe to a point well beyond the dam and eventually finds its way into the stream flowing down the valley. Apart from the water accompanying the tailings delivered to the dam, there is the drainage from the hillside, the amount of this water in periods of heavy rainfall being considerable. However, the capacity of the main drainage pipes, which are 18 in. in diameter, is so great that even in times of the heaviest rainfall all the water from this source as well as from the tailings is carried away. Mill reports Mill reports required are:
The mill running time is eight hours per day, of which the feed is on for seven and a half hours, the remaining half an hour being allowed for closing down. Weight milled per hour averages thirteen tons, although the plant is capable of treating up to eighteen tons per hour. Average grade of heads is 5 per cent. to 10 per cent. Pb, and that of concentrates is 79 per cent. Pb. The recovery is 90 per cent. Milling cost per ton of ore is 9s. 8d. Sampling Flotation concentrates are grab-sampled as each barrow leaves the filter while spear samples are taken of table concentrates as each concentrate box is drained. Flotation tailings are sampled by an automatic cutter designed and made on the mine, and adjusted to pass beneath the discharge pipe every quarter of an hour, the cutter discharging the sample down a launder into a bucket which is securely locked in a cupboard. The tap regulating the flow of water which operates the sampler is also locked to prevent interference by mill employees. The amount taken is 20 lb. wet. Table tailings are sampled by a Wilfley automatic sampler which cuts the tailing launder from the four tables before the stream enters the Gwynne pump sump. This sampler is also water operated, with the top locked to prevent interference, and is arranged to make a cut every quarter of an hour. Jig tailings are sampled by hand. A receptacle is drawn across the discharge weir of each machine every quarter of an hour. Concentrates for despatch are spear sampled as each lorry stands on the weighbridge. Preparation of samples for assay Samples of jig and table tailings are crushed to pass 16 mesh. They are then riffled to a quarter of the original volume, reduced to pass through a 100 mesh screen and mixed by rolling on American cloth. The final sample is then taken with a spoon. The flotation tailings are allowed to settle overnight and the surplus water is syphoned off, leaving a cake which is dried and mixed. Very little grinding is needed before the final sample is taken as most of the material passes 100 mesh. Concentrate samples are ground to pass 100 mesh, and the same procedure is followed as for tailings. Labour The present labour force resides in the village of Glenridding, one and a half miles from the mine, living in fifty of the company's cottages, and is transported daily to the mine by lorry. All underground operations except supervision are carried out on a contract basis, the mill and crushing section labour receiving a bonus based on running time, recovery and tidiness of the plant. Other employees are paid day rates. The full pay is made up every fortnight, with a £2 interim payment on alternate weeks. The mine, mill, crushing section and power stations work an eight hour day making an eighty-six hours fortnight. Surface workers have an eight hour, forty-eight minute day for a five day week. The total number of men employed is 90, of which 47 are employed underground and 15 in the mill. Surface buildings Situated on the property there is a well-equipped blacksmith's shop, and engineering shop which houses two lathes, one large drilling machine, one mechanical hack saw, and an electric welder, a wagon repairing shop, electricians' shop, and carpenters' shop. A saw mill which adjoins the carpenters' shop, cuts all the timber required by the mine. Other buildings include an office building consisting of four rooms, an ambulance room, miners' and staff change-rooms, each having bathrooms containing sprays and wash basins. There is also a large store containing four thousand pounds worth of mining and milling supplies. Acknowledgments The author acknowledges with thanks the permission of the directors of Basinghall Mining Syndicate Limited to publish the article. He also thanks all those who have assisted in the preparation of the material presented. Drawings and Photographs accompanying the article
Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.
|
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||