Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mine & Quarry Engineering - Main Index
Mine & Quarry Engineering - Subject Index
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
 Mine & Quarry Engineering November, 1951 

Ventilation

The mine workings are extremely well ventilated, the down draught entering the mine along the adit, down the shafts and along the bottom levels, the up draught percolating through the stopes to the outcrop. Auxiliary ventilation is used only in development headings, which have no connections with the levels above.

Pumping

The mine is comparatively dry, the only inflow of water being seepage from the surface, so that its rate is governed by weather conditions.

The levels are dewatered in three stages, first a Tangye 3-throw ram pump on the 217 Fm. level, next a Lee Howl 7-stage centrifugal pump at Murrays Shaft on the 175 Fm. level, and third a Mackley 7-stage centrifugal pump at the bottom of Smiths Shaft on the 90 Fm. level. The three pumps are electrically operated.

These pumps are run for eight hours per day and can cope with the maximum inflow. Large capacity storage sumps, which can safely hold 48 hours inflow of water, have been made at each pumping station.

Exploration and stope development

Since 1936 development and exploration has been carried out to the north of Smiths and Murrays Shafts by drifts measuring 7 ft by 7 ft., at intervals of 150 feet on the dip of the vein.

The type of machine at present in use in all development headings is the Holman S.L. 280 roto feed drifter mounted on a 4-inch crossbar with ratchet jack. Each heading is manned by a crew of two, driller and drill helper. Due to the high silica content of the country rock, castor oil sprays are in use after every blast, which takes place at the end of each shift, and an interval of 16 hours elapses before the crew return to clean out the broken rock.

In preparing the level for stoping, boxholes 6 ft. by 6 ft. are put up on the footwall side of the mineralised vein at 20 feet centres, and are risen 10 feet above the roof of the main level. The tops of the boxholes are connected by a stope sublevel, leaving a 10-foot pillar between the floor of the sublevel and the roof of the tramming level. The broken ore from the sublevel falls into the chutes and is easily disposed of. After this work is finished, stoping can proceed according to the method employed. On sections where the ore is very rich, the roof is blasted down to give a height of 16 feet above the roof of the level. Timbers are then hitched between the foot and hanging walls at 4 feet centres, chutes being installed, as in the case of boxholes, at 20 feet centres. The timbers are afterwards covered over with round coverwood and lagging. When timbering is complete, the back is drilled and blasted lightly to form a cushion, after which the place is ready for normal stoping. Ingersoll Rand S.A.R. 120 stopers are used for boxholing, and Gardner Denver 79 drifters for sublevelling. A drilling crew consists of two men, driller and drill helper, the drill helper clearing the ore from the completed boxhole while the driller goes on to drill the next.

Stoping methods

Two methods are employed, namely shrinkage and underhand stoping.

Shrinkage stoping, although having the great advantage of cheapness and convenient storage for broken ore, is not often employed in blocks where the stoping width is likely to be below six feet, the disadvantage being that a considerable amount of drilling time is lost due to the broken ore hanging up in the stopes. In stopes where the widths are greater than six feet the shrinkage method is usually employed. No support is required in the stopes, the walls holding up in some cases for many years after the stopes have been drawn empty. The drills employed in shrinkage stoping are mechanical feed drifters and stopers similar to those used in stope development. Two men are detailed to each stope.

In areas which have been selected for underhand stoping the ground is blocked out by sublevels at 30 feet intervals. There are rises at each end of the block and one in the centre. The centre rise is used as a breakaway, stoping retreats to each end, and the bottom blocks are mined first, giving the miners overhead protection when drilling on the bottom bench.

Drilling is done by Ingersoll Rand X 59 and Holman "S.L. 12A" Jackhammers 84 lb. in weight, using two men in a crew to each block.

The accompanying table shows the mining efficiency from figures compiled over three years, in which the abbreviations T/M is used for "Tonnage broken per machine shift" and lb./T. for "lb. of explosives used per one ton broken."

Stoping Widths Underhand  Shrinkage 
T/MLh./TT/MLb./T
0 ft. — 4 ft.  14.23 1.140 9.18 1.610
4 ft. — 5 ft.  17.33 0.798 11.92 1.150
5 ft. — 6 ft.  20.88 0.676 14.47 0.896
6 ft. — 7 ft.  19.93 0.706 15.63 0.796
7 ft. — 8 ft.  20.06 0.718 18.27 0.743
8 ft. — 9 ft.  18.20 0.780 18.50 0.817
9 ft. —12 ft.  26.60 0.538 23.60 0.547
Over 12 ft.  39.20 0.396 51.40 0.284

Ground breaking

Wet drilling is used throughout the mine. Compressed air is supplied by two compressors, one of which is a Sullivan class WN-31 Angle Compound two stage machine with a working pressure of 100 pounds per square inch, producing 1,000 cubic feet per minute, which is driven by a Westinghouse 175 h.p. motor, and the other a double-stage Sentinel Compound Inter-cooling Compressor made by Alley and MacLellan, Glasgow, which produces 650 cubic feet per minute. Both compressors are in a chamber cut out of the country rock at the top of Smiths shaft.

One inch hollow hexagonal 0.65-0.70 carbon drill steels with plain shanks are used for development, stope development, and breast stoping. Steels collared with 4½ inch shanks are used for winzing and underhand stoping. Blunt steels are collected daily and taken out of the mine to the drill sharpening shop for re-sharpening. Cross bits are forged by an Ingersoll Rand I.R.40 sharpener. Three lengths of steel are in use, 2 feet, 4 feet and 6 feet, with bit gauges of 1 5/8 inches, 1½ inches and 1 3/8 inches.

The explosive used is Nobels Polar Ammon Gelatine Dynamite, four ounce cartridges, which are 1¼ inches in diameter. Electric blasting is carried out in winzing and rising, while blue sump fuse with number 6 detonators is used for other operations. Blasting takes place daily at the end of each shift. Between 2,000 and 3,000 tons of ore are broken in the mine monthly, 1,800 tons being delivered to the mill.

Filling and tramming

Mucking in development, stope development, and within the stopes, is carried out by the drilling crews as part of their contract. No mechanical methods are employed.

The traffic crew, consisting of hoistmen, onsetters, loco-drivers and hoppermen, are responsible for the tramming of the ore from development, and stope development faces, and for the filling of ore from chutes in shrinkage and underhand stoping.

Tracks are of 22-inch gauge, the rails being 25 lb. in levels served by Smiths Shaft and 30 lb. in the Lucy Adit. All rails are fishplated and dog-spiked to wooden sleepers. U-shaped side tipping wagons of 16 cubic feet capacity are used throughout the mine.

Three B.E.V. type storage battery trammer locos, made by Wingrove and Rogers Ltd., of Liverpool, are used on the haulage levels below the Smiths Shaft. They have Exide Ironclad Batteries of 24 cells, 240 ampere hour capacity driving 4 h.p. 40-volt motors with worm gear drives. A larger battery loco by the same makers operates on the Lucy level. It has a battery of 28 cells with 290 ampere/hour capacity. Battery charging equipment to charge three batteries together is installed on the 175 Fm. level for charging the three trammer locos, with two Mercury arc rectifiers on surface for charging the "Lucy" loco batteries.

Hoisting

The entire length of the Internal Shaft is lined with steel sets made of 6 in. x 5 in. steel girders. Each of the two cages slide on four pitchpine guides 4 in. x 3 in., and is served by a single drum hoist designed to lift an out of balance load of fifteen cwt.

The Murrays Shaft, which is inclined at about 75 degrees, is 510 feet from collar to bottom. Dividers are hitched from foot to hanging wall, and are spaced at six feet intervals. Bolted to these dividers in each compartment are two pitchpine runners 6 in. x 4 in., one on each side and half-way between foot and hanging wall. On the face of the wooden runners, strips of steel eighteen feet long are nailed to form a hard-wearing surface. The cages have four flanged wheels, two at the top and two at the bottom, and the cage is slung so as to make the bottom level. At the top of the shaft is a double drum hoist with electric drive, constructed on the mine by the old Greenside Mining Company.

The Smiths Shaft, which is 540 feet from top to bottom, is timbered with sets every six feet. The hoisting compartments have timber guides, four to each compartment, and of the same construction as those in the Internal Shaft. 13/16 inch diameter hoist ropes are standard to the three shafts.

The signalling equipment comprises of Tangent Touchtone Horns, and Tangent Bells. The horns are operated by the hoistmen, and the bells by the onsetters. One bell and one horn with touch buttons are installed at every shaft station.

In the mine there are also two Holman single drum internal geared electric hoists capable of lifting a gross load of one ton at an average rope speed of 260 feet per minute, which are used for hoisting up winzes. Two Holman air hoists, and two Sullivan single drum Turbinair hoists are mainly used for hauling supplies up stope gateways.

(To be continued)

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print