Thomas Sharpe
Three persons lost their lives by an inrush of water from old workings in the 2nd North District of the Yard Seam at the Fanny Pit, Heworth Colliery, Durham. A pony was also drowned. The Yard Seam was 2 ft. 9 ins, thick and the method of working was Bord and Pillar in the solid. The Bords and Walls (or headways) were driven about 7 yards wide to form pillars 28 yards by 20 yards. The coal was undercut to a depth of 4 ft. 6 ins. in the bottom of the seam by electrically driven longwall chain machines adapted for narrow work, and was conveyed along the face roadways and delivered into tubs on the mechanical haulage road means of branch conveyors delivering on to trunk conveyors. A bottom canch was taken up to make height in the main haulage roads. The face and conveyor roadways were seam height. The average inclination of the seam was about 1 in 18 and the district was advancing to the rise. There were 15 persons in the district at the time. So far as the presence of water was concerned the normal condition in the district immediately prior to the inrush might be described as "damp." There was nothing to cause alarm. Indeed it was stated in evidence at the Inquest that the actual place of holing was not only drier than usual but was the driest in the district. Two men, Thomas Charlton and John Stephenson, were coal cutting in the 6th West Bord. They had undercut about 4 yards from the left side of the place when the cutting jib effected a holing with an old working, the existence of which was unknown to the management. There was a sudden inrush of water. Both men were swept down the bord to the belt headways where they regained their balance and made their way outbye. The other men and lads were soon aware of the catastrophe. The water rushed out of the belt headways and poured down the main haulage road with considerable velocity and volume. Very soon it completely blocked the roadway at a swelly some 700 yards outbye. Beyond the swelly the road rises about 1 in 18 towards the Fanny Pit shaft. The overflow from the swelly rose up this road several yards and then poured down a roadway to the left, eventually finding its way to disused workings by way of a dip drift to the Bensham Seam. Charlton, and two lads, rushed outbye along the haulage road and got through the swelly before it filled. As soon as the deputy knew of the inrush he collected all the men and lads he could find but they were unable to get outbye along the haulage road. Eventually they reached the Fanny Pit Shaft by way of the return airway, regaining the main haulage road to the shaft at the outbye end of the swelly. By this time it was discovered that three workmen named Nattress, Sharpe and Farrell were missing. A rescue party going inbye along the return airway made a complete search of the face workings without success, and when the water in the swelly subsided, the bodies of the missing men and a pony were found there. No one had seen Farrell and Sharpe since the moment of the inrush. Nattress was originally one of the party collected by the deputy but he separated and ran outbye. The pony had been attached to a set of full tubs but he became so terrified through being lashed by debris carried by the flood, that the deputy was compelled to unhitch him and let him free. The swelly was approximately 103 feet below the point of holing and a rough estimate of the quantity of water that came through was 1½ million gallons. From the evidence it would appear that the water came off at first under considerable pressure, which rapidly decreased, indicating that there had been an appreciable head but little volume. These factors suggest that the holing had effected a connection with accumulated water in old workings of limited extent but communicating with an old shaft or shafts in the vicinity. This was later proved to be the case when the existing working plan was compared with an old plan in the possession of the Mines Department. This old plan showed that there were three old shafts in the immediate vicinity of the place of holing. The names of these old shafts were given in the 1928 Catalogue of Abandoned Mine Plans. It is a great pity that this unfortunate occurence resulted in the loss of three lives, since apart from the fact that the water in the swelly subsided soon after, there was available a second and safe means of egress from the district. Arising out of this accident, I would direct the attention of colliery managers to two important points :— (1) The vital necessity of exploring every avenue open to them to find out whether or not there are existing plans showing old workings or shafts in or about their mineral takings; and (2) The importance of eliminating, wherever practicable, "swellies" or depressions in the roadways affording a means of egress from any district of a mine where there is the slightest fear of an inrush of water. In the case in question it would not have been big job to have raised the level of the roadway in the swelly sufficient to prevent it from being blocked by water.
If you are researching Thomas Sharpe (e.g. for family tree purposes) and you would like to hear from others with the same interest then please complete the details in the following form. We will show the information you provide on this page so that you can be contacted.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||