logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

  Individual Details   Individual Details  
 


John Tucker

Age:   13
Died:   4th Sep 1894
Accident:   4th Sep 1894 2:30 PM, 9th hour of shift
Year Born:   abt. 1881
Colliery:   South Pontop
Company:   U. A. Ritson
Occupation:   Coupler
Notes:  
Fell from one of the shaft mouthings on to the top of a cage, a distance of 75 feet, receiving such injuries that he died in a few hours
Buried:   [not known]
Category:  

Description

Number 53 on the list occurred at South Pontop Colliery, on the 4th of September, about 2.30 o'clock p.m., causing the death of John Tucker, a coupler.

At this colliery there are two shafts, one a downcast, and the other an upcast, about 14 yards apart, and coals are brought to bank at both of them, but the men are, only lowered or raised at the downcast shaft. Deceased was working in the Shield Row Seam, which is 9½ fathoms from the surface; all the coals from this surface are sent up the upcast, and it is the onsetter's duty to attend to both shafts.

On the day in question, it appears the deceased boy was sent to bank for a meal for a man who was staying in the pit; the onsetter came from the upcast shaft with him, signalled for the cage to be sent to the Shield Row Seam, put him into it, and then signalled for it to be taken to bank, which was done; the onsetter then returned to his work at the other, or the upcast, shaft. The boy went to the man's house, got the meal, and returned to the pit, and the banksman told him to get into the cage, which had not been moved since he came to bank, and, without doing anything to ascertain whether the onsetter was at the entrance to the Shield Row Seam, sent the cage away. It stopped at that seam, but the onsetter was at the other shaft, and deceased, who had no light with him, attempted to get out of the cage, but did not see or forgot about the gate being closed, and ran his head against it and was knocked back into the shaft. He was found on the top of the other cage, 75 feet below, and was so severely injured that he died on the following day.

There were no means at this shaft, as required by section 49, General Rule 25, of the Coal Mines Regulation Act, of communicating distinct and definite signals from the surface to this seam.

The manager said he did not think it was necessary, as it was only 9½ fathoms, or 19 yards from the surface to this seam, and the General Rule states that the means of communicating signals must be used if the shaft exceeds 50 yards in depth. This shaft is 120 yards in depth, and this seam is only one of the entrances to it.

This was not, however, the cause of the accident. The banksman did not carry out his duty, as required by Special Rule 86 of No. 3 Rules, which reads thus: "When persons are to ascend, or descend, the agreed signal shall be given by the banksman or onsetter only, except where otherwise authorized; and when persons are descending, or ascending, the banksman and onsetter shall remain in a position so as to immediately signal the engineman in case of an accident."

The agreed signal, under this Rule, up to this time, had been by shouting to the onsetter, but in this case the banksman did not do so, and, in consequence, did not enable the onsetter to be at his place to receive the cage. If he (the banksman) had attended to his part, the onsetter would have gone round to the downcast shaft, and had the gate open, and this boy would not have been killed.

The banksman was severely reprimanded, and the management undertook that he should be dealt with for his neglect of duty.

A down over signal has, since the accident, been put into the Shield Row Seam, and is arranged to signal to both the upcast and downcast shafts at the same time, so that the onsetter can hear any signal that is given whichever shaft he may happen to be at.


Mines Inspectors Report Entry


Sources
  • 1894 Mines Inspectors Report (C 7667), Durham District (No. 4) by Thomas Bell, H.M. Inspector of Mines, Page: 19 Where to find this report
  • 1894 Mines Inspectors Report (C 7667), Durham District (No. 4) by Thomas Bell, H.M. Inspector of Mines, Page: 42, Accident Number: 53 Where to find this report

Researchers

If you are researching John Tucker (e.g. for family tree purposes) and you would like to hear from others with the same interest then please complete the details in the following form. We will show the information you provide on this page so that you can be contacted.

What is your name?
What is your contact email address?
What is your research interest?

 

Return Return   Return Return to Top

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print