logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

  Individual Details   Individual Details  
 


Frederick Richard Daniel

Age:   35
Died:   12th Dec 1924
Accident:   12th Dec 1924 10.0 a.m., 3rd hour of shift
Year Born:   abt. 1889
Colliery:   South Crofty (Tin)
Company:   South Crofty Ltd.
Occupation:   Miner
Notes:  
Fall of side onto staging — precipitated down the shaft
Buried:   [not known]
Category:   Shaft Accidents :: Ropes or chains breaking

Description
U1924-71

At South Crofty Mine, Cornwall, 12th December. — Three men were killed and three injured. The Cook's Kitchen Shaft, at which this accident occurred, is vertical, rectangular in shape — 18ft. long and 6 ft. wide — and secured by timber lining. Mineral is worked at a number of levels, the lowest of which is 245 fathoms from the surface ; and, below this, sinking operations have been in progress for some fourteen or fifteen months. The work has been carried on on one shift only, and the rate of sinking has been about two fathoms per month. The winding engine used for the purpose is installed at the 245 fathoms level and consists of a compressed air driven winch.

The ground in which the shaft is situated is very hard and in order to avoid damage from shot-firing the timber lining is kept a distance of from 30 ft. to 40 ft. from the bottom. The rate of sinking has been such as to necessitate the installation of a new set of timber about once a fortnight. The whole of the timbering below the 100 fathoms level has been done under the supervision of a foreman timberman named Ernest Luke.

On the afternoon previous to the accident, Captain John Thomas, who has had charge of this section of the mine for upwards of six years, on making an inspection of the shaft, gave Luke orders to install a few more sets of timber on the following day, and on his return to the surface instructed the storeman to get out the necessary appliances — chains, hanging bolts, ropes and tools — and to overhaul them. This, he is said to have done and in due course the whole of the tackle, together with the required timber, was placed at the top of the shaft ready for use.

On the morning of the accident, Luke, together with William James Mitchell, foreman shaftsman, David Vincent, Telfer Mitchell, Harry Pendray and Frederick Richard Daniel, miners, came on at 7.30 and descending to the 245 fathoms level, commenced operations. They first removed the rider and then lowered a wall-plate timber and suspended it by means of two sling chains, after which, they lowered a second timber, suspending it in like manner. They then placed from 18 to 20 planks, 7ft. 4ins. by 8ins. by 2ins. upon these wall-plate timbers to form a staging or scaffold. Two hammer drills and hoses were then sent down to the staging and while the four miners were engaged at one end in boring short shot holes for the purpose of making additional room for the lining, the foreman shaftsman and Luke commenced to take off some side at the opposite end, and while doing so, detached a piece of rock estimated at about ¾ cwt., from a point about 2 ft. above the staging and this striking one of the sling chains broke it and the whole of the men, together with the planks, were precipitated to the bottom of the shaft, 34 ft. below.

John Martin, who was stationed at the 245 fathoms level, hearing what he thought to be a signal calling for him, descended the shaft and found the men lying at the bottom. He immediately obtained assistance and they were brought to the surface with all speed. Daniel, however, was found to have been killed and the other men severely injured. They were removed to the Miners' Hospital, Redruth, with as little delay as possible, where two days later Pendray and William James Mitchell succumbed to their injuries.

A subsequent examination of the chain showed it to have broken a short distance from the upper hook. The link which parted was of wrought iron, 3/8 in. diameter by 3¼ ins. wide, and welded at the end. The breaking strain for such a chain taking the tensile strength as 15.5 tons per square inch, would be approximately 3.79 tons. The safe working load, allowing a factor of safety of 10, equals 7.6 cwts. The total load which the four chains were carrying was about 26 cwts.

An examination of the link showed a fracture to have taken place across the weld. There was no evidence to show that any undue strain had been placed upon it, and while one side was somewhat less curved than the other, it is probable that this resulted from its remaining hooked on the next link after it had actually opened. When examined immediately after the accident the surface of the fracture was found to be rusty and had the appearance of being one of long standing. A closer examination showed the weld to have been defective due to the presence of foreign matter — scale or dirt — between the joining surfaces, and also to the metal having been overheated causing it to become brittle. No record as to the annealing of or work done by the chain was available at the mine, but it was said that prior to the commencement of sinking about fifteen months ago all the gear was overhauled and the whole of the sling chains annealed. It seems probable that even had annealing been done more frequently owing to the metal having been burnt at the time of welding, it would not have rendered the link safe for use, but it might have led to the detection of the flaw. It is possible if the chain had been laid upon a table and each link examined carefully the defect might have been detected but it is not at all certain that it would. I do not think, however, that it could have been detected by any examination made underground. In addition to any examination made by the storeman it was the duty of Luke to examine all such tackle before putting it into use.

Safety belts were not used. A number of such belts were provided at the mine, but the men would not use them except for the purpose of examining ground under stulls or in open gunnisses. Had they been used the men would probably have escaped injury. Since the accident the management has decided to insist upon their use until the wall-plate timbers have been secured by means of the hanging bolts and the planks placed into position. The broken chain ought to have been annealed more often and it would have been better to have had a stronger chain. Stronger chains of 5/8 in. diameter have since been provided, and in future a record will be kept of both annealing and work done, and, in future, only chains having a factor of safety of at least 10 and which have been properly tested will be used. All chains will be annealed at least once in six months. No chain will be put into use until it has been thoroughly examined by a competent person and a report of each such examination recorded in a book kept at the time for the purpose. No work is to be done on the scaffold or staging until such of the hanging bolts as it is possible to fit forthwith have been fitted.


Sources
  • 1924 Mines Inspectors Report, Midland and Southern Division (No. 8) by H. A. Abbott, H.M. Inspector of Mines [DMM Ref: L-01624 - Tom Bainbridge Collection], Page: 45
  • 1924 Mines Inspectors Report, Midland and Southern Division (No. 8) by H. A. Abbott, H.M. Inspector of Mines [DMM Ref: L-01624 - Tom Bainbridge Collection], Page: 66, Accident Number: 79

Researchers

If you are researching Frederick Richard Daniel (e.g. for family tree purposes) and you would like to hear from others with the same interest then please complete the details in the following form. We will show the information you provide on this page so that you can be contacted.

What is your name?
What is your contact email address?
What is your research interest?

 

Return Return   Return Return to Top

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 15 Mar 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print