E. Johnson
No. 4 Accident. Clay Cross Works. — Four persons killed by a round wire rope breaking. This was a new rope, three months worked, 1 1/8 inch diameter, and employed to raise a load of 35 cwts.; the pulley 10 feet diameter, the drums 9 feet diameter. The rope had been winding coals from 6 o'clock in the morning until 12 o'clock at noon, when the pit stopped for dinner. During the dinner hour the engine-man and stoker repaired the spring on the rope end ; to do this there was some slack rope run off, in order that the spring might be lowered on to the pit bank. Between two and three rounds were run off the drum to lower the spring on to the bank. After the repairs were done the rope was drawn up, and the cage left standing on the props until starting time. The engine-man can see the drum as it is in the engine-house, and according to his statement he noticed that the rope was right upon the drum. Upon starting after dinner the deceased got on the cage to go down, and when about 15 yards down the shaft the rope broke near the drum. On each side of the fracture I tried the wires, and found them to be tough and of good quality. I also tested the rope, and found that it would bear a strain of 10 times the weight that broke it in the pit without breaking. The fracture was new, no old broken wires. There was an appearance of the rope having been partially cut at the fracture ; but there was nothing about the machinery to do it. If maliciously done, it must have been done when the engine-man and stoker were engaged on the pit bank. A person could enter the engine-house unseen by any one on the pit bank. By what means it was injured so as to break with this light weight upon it we were not able to trace. The ropes of this Company are daily examined by a competent person, and during the morning he had examined the ropes on this pit. There was a probability that when slack rope was run off to repair the spring, the rope might have got a "kank" in it, and have broken when the weight of cage and men was suspended upon it. I "kanked" a part of the rope, and tried to break it with a sudden weight of several tons, but did not succeed. I examined the end of the rope on the drum carefully, in order to see if it had been "kanked," but none of the wires were in the least bent. The whole of the tests proved the rope to be of good quality. At the fracture those wires which had not been cut were drawn very small, showing the tough quality of the wire. Machinery and management need not be in a more satisfactory state than that of the Clay Cross Company. The chief manager, Mr. Binns, spares no expense to secure the most efficient of both.
If you are researching E. Johnson (e.g. for family tree purposes) and you would like to hear from others with the same interest then please complete the details in the following form. We will show the information you provide on this page so that you can be contacted.
|
|||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||