logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

  Individual Details   Individual Details  
 


Jonathan Piggford

Age:   42
Died:   20th Jul 1878
Accident:   20th Jul 1878
Year Born:   abt. 1836
Colliery:   New Hollingwood
Company:   Staveley Iron and Coal Co.
Occupation:   Sinker
Notes:  
Adjusting steam pipes in the shaft when they gave way
Buried:   [not known]
Category:  

Description

Shafts.

No. 25 in the list. Four men were killed in a shaft at Hollingwood Colliery, Staveley. The evidence given before Mr. Coroner Busby will best describe the accident.

Joseph Humble, of Barrow Hill. Staveley, colliery manager to the Staveley Company. —

I am manager of all the coal mines and pits, including the Hollingwood New Pumping Shaft, where the accident occurred. I have a plan of the pit bottom showing the portion in which the pipes were before the accident (describing the plan). The main bunting at the bottom to support the pipes is two feet six inches deep and 18 inches wide. The pipes are six inches diameter inside. There were two sets of pipes in the shaft, one for steam, one for water. We fixed them from the bottom upwards. There were 215 yards of steam-pipes and 160 of water-pipes in the shaft at the time of the accident. There was only one more steam-pipe to put in at the top to connect it with the steam-pipes from the boilers. They were supported with a bunting every fourth pipe, i.e., every 12 yards, by a bunting and a strap of cast-iron (2½ inches by ½ inch at least). The buntings were of pitch-pine 9 or 10 inches square. The straps were bolted to the buntings. The pipes supported themselves. There were no other means of supporting the steam-pipes in the shafts except by their own weight. There was no bracket on the line of steam-pipes. Some days before Friday, the 19th July, the steam-pipe was commenced to be put in from the bottom. When they got to the first bunting the enginewright, or some of the men working, told me that the first bunting was at the sixth pipe from the bottom. On account of this I told them we would put in an extra bunting just above the arch at the pit bottom. The brickwork was taken out at that point to admit of the bunting end being put in. John Elliott, the enginewright, who was in charge with the fixing of those pipes, put the bunting in this shaft on Tuesday or Wednesday night the 16th or 17th July. There were two copper-wire lines hanging down from the pit top. The buntings were to be placed in 13 inches from the lines of the wires. The pipes having been up, Elliott tells me he thought they were all straight, and he put the bunting up to the pipes instead of gauging by the wire lines (the bunting holes were already in the shaft). On Wednesday or Thursday morning (July 17th or 18th), Thomas Shore when he reached the bunting (tells me) that he found one end of the bunting two inches nearer the copper line than it ought to have been. The bunting was then bricked into the shaft, and I therefore told him not to touch the bunting, as I considered the pipes and bunting secure, notwithstanding its being two inches out of plumb. I told Shore (his men being present) that if they had time they might cut two inches out of the bunting and tighten the holts so as to bring them in a perpendicular line to the bunting. They continued putting the pipes in until Friday afternoon 19th July. They were wailing for pipes between five and six p.m., so they commenced to tighten the joints by screwing the bolts at each joint. When they got to the extra bunting (above the arch) I am told that they commenced to alter the bunting. They cut the brickwork out at each end of the bunting for the purpose of loosening it, and so pushing it backwards inside the shaft, contrary to order. When the bunting was got out the Monday after the accident we found the strap off it and the two bolts remaining in the timber without the nuts. From that I concluded that as soon as the men had taken the strap off, the pipes being out of the true line between the bottom and the fifth pipe, the weight of the pipes would cause the bend to increase towards the shaft side. This liberated the steam-pipes which broke off at the third joint, and so liberated the straps and pipes above, and all the steam-pipes from the top to the bottom fell down, cutting away the extra bunting and several buntings above it, and caused the scaffold, on which the men were, to fall down to the bottom with them. The buntings having been broken as above, liberated the water pipes which fell down immediately after the steam-pipes, 215 yards of steam-pipes and 145 yards of water-pipe fell, leaving 154 more of water-pipe standing in the shaft The expansion of the steam-pipes from top to bottom is about 12 inches, and that expansion prevents it from fixing the steam-pipes tight with Literal support. There are collarings put to prevent them oscillating. It would be more secure to put in double buntings, but I have never seen it done, there are not any marks on the extra bunting of the men having commenced cutting as I ordered them. The men's shift commenced at 6 p.m., and the accident happened at 7.30 p.m.

The depth of the shaft from top to bottom of sump was 242 yards. There were 24 yards of water in the sump at the time. Both the piping and men went into the sump. They would have fallen six yards to the top of the sump water, they would have been drowned in the sump. The bodies of Mannion and Meeson were found on Sunday afternoon, 21st July, and Piggford and Holmes on Sunday night, and all four men were brought out of the pit at 10 p.m. Thomas Shore, the enginewright, and John Radford, the master-sinker, were in charge of the pit at the time of the accident. Shore, Radford, and I were standing talking about 20 yards from the pit at the time of the accident. I supposed the four men to be in the shaft. Piggford was the charge-man of the sinkers, and he superintended the putting in of the pipes and screwing the joints. The other men had to obey his orders. Piggford received his orders from Shore and Shore from me.

By Mr. Clegg. — Elliott should have gauged the extra bunting from the copper lines before bricking it up. Elliott was the other charge-man. Elliott was on one shift and Piggford on the other. It was a new shaft just completed from top to bottom. It had not been used for anything. No pipes have fallen before in this shaft. In the old shaft near to it the shaft side gave way and the pipes fell. Three lines of pipe fell, steam, water, and exhaust pipes.

(By Mr. Markham.) — The steam-pipes were stayed in the ordinary manner. The expansion of the pipes would have prevented them having been fixed. I have never known steam-pipes fixed in any other manner. The side pressure on the pipe would be about six cwt., i.e., it would have taken that pressure to bring them to a central line. After this accident we shall double the buntings in other shafts as an extra safeguard, but these would have been sufficient if the orders had been obeyed. There would have been a risk in removing any strap, but the greater risk the deeper down the shaft.

Matthew Abbott, of Speedwell Terrace, Staveley, fitter :—

I had been working at the pit bottom of the new Hollingwood Shaft on Friday afternoon. I worked between the bottom of the shaft and an engine in the mine about 40 yards off. The place in which Piggford and his men were working was from six to eight yards above the pit bottom. I passed the four deceased as I went up. They were pulling the bricks out from behind a bunting as I passed them. I went steadily past. I did not say anything to them. As I passed them they asked me to bring them a spanner down. I came down the shaft again about three minutes before the accident. I passed them at the same bunting as I went down. I had forgotten the spanner. Piggford asked me if I had brought the spanner. I said I had not, but I had one at the bottom and would put it in a skip and send it up to him. They were waiting for the spnnner, doing nothing, when I passed. I went to the bottom and sent them up a spanner in a skip. The skip reached the scaffold. Jonathan Piggford took the spanner out. He commenced undoing the nuts on the clams. I went away a little distance from the bottom. In a little over a minute I heard the pipes come down. They had oil lamps on the scaffolding. The scaffold was held up by four chains to the rope.

(Examined by Mr. Clegg.) — They were using the spanner, but I cannot say whether to screw or unscrew. They had time to unscrew two bolts before the accident after they received the spanner. They said they wanted the spanner for the clam bolts, a spanner to fit the clams.

(Examined by Mr. Markham.) — I am certain that they cut away the brickwork behind the buntings and wanted the spanner to screw or unscrew the bolts. Some time before I went up they told us that they were getting the brickwork out, and told us below to take care.

Arthur Holmes, of Staveley (Chesterfield Road), sinker:—

On Friday 19th July, at 20 minutes to 8 p.tn., I was at the bottom of the New Hollingwood shaft in the archway. I went down at 2 p.m. Matthew Abbott had just come down and handed me a spanner which he found in the archway. I put it in a skip. I told Edward Holmes on the scaffold to "hold up" when he was ready for the spanner. He called to the engineman at the top to "hold up." I sent the spanner. Then I went away from the shaft before the spanner started, and had got about 20 yards away when I heard the pipes fall.

(Examined by Mr. Clegg.) — I went away from the bottom just before Abbott. At about halfpast 7 p.m. Mannion told me to keep out of the way when he was picking some bricks out. I could see them picking them out from in front of the hay.

Thomas Shore, of Ireland Colliery, enginewright.:—

I have charge of the sinking shaft at New Hollingwood for the job of putting in steam and water pipes. I was down the shaft half an hour before the accident. I examined the steam and water pipes, the buntings and fastenings. At about 7 p.m. on Friday 19th July I gave orders to deceased (Piggford) at the pit top as he was going down. I told him that the pipes were a little bit out of line, and he was to take a little bit out of the (extra) bunting to let the pipes come into the straight line again, and he would get a new strap made and put on. Mr. Humble and I had talked about it the same day, and he gave the same order to me and to Piggford as well. I did not tell him to take off the strap. We were going to shove the pipes back with a screw-jack, and to put a new strap on to keep them tight when they wedged into their places. There are three shifts of sinkers. The men who went off at 8 a.m. screwed up the joints from the extra bunting for some distance upwards (perhaps 10 or 12 joints — 30 or 40 yards). The other joints were screwed up by Piggford's shift of men. I knew that the deceased were in the shaft. I was talking to Mr. Humble against the lamp-cabin when the accident happened. I knew that the men were near the extra bunting. I have seen the extra bunting since. It is broken in two just against the outside bolt. The bolts are in good condition. The threads are perfect. I am sure that the nuts have been taken, not wrenched off. The bolts were some 5/8 ths, some ¾ths. In my opinion the men bad taken away the straps, and so taken away the support from the pipes. The pipes were a little out of the perpendicular at that point. The strap is to hold the pipe from the wall and up to the bunting. Piggford had charge of the shift. He was a blacksmith, and a man of experience in pit sinking. The buntings go about 10 inches into the wall. They go into metal pockets. I think the pipes must have fallen from their having pushed it. The bunting broke from the pipes falling, and the pipes did not fall from the bunting breaking.

(Examined by Mr. Clegg.) — Mr. Humble gave instructions to Piggford that day and the day before. He said we were to cut two inches out of the buntings, or a little more if necessary, and to tighten the bolts up. They could not do that without a new strap. Piggford had been under my charge about a year and a half.

John Radford, of Clown, sinker:—

I am master sinker at New Hollingwood pit. I was 30 yards from the pit top when the pipes fell. I had nothing to do with the pipes down the shaft. I heard Mr. Humble on Friday, the 19th July, tell Piggford twice, both in the morning and in the afternoon; there were others present, at least the first time. Piggford was telling Mr. Humble about the extra bunting being a little bit out of plumb. Humble told Piggford not to touch the bunting or the strap, but to take a little bit out of the back side and if he did so it would cause it to go into its place gradually. It was only two inches out.

(Re-examined). — Mr. Humble did say Piggford was to cut two inches out of the bunting and tighten the bolts. The bunting was put in on Wednesday night by John Elliott — or Thursday.


Sources
  • 1878 Mines Inspectors Report (C 2321), Midland District by Thomas Evans, H.M. Inspector of Mines, Page: 109 Where to find this report
  • 1878 Mines Inspectors Report (C 2321), Midland District by Thomas Evans, H.M. Inspector of Mines, Page: 146, Accident Number: 25 Where to find this report

Researchers

If you are researching Jonathan Piggford (e.g. for family tree purposes) and you would like to hear from others with the same interest then please complete the details in the following form. We will show the information you provide on this page so that you can be contacted.

What is your name?
What is your contact email address?
What is your research interest?

 

Return Return   Return Return to Top

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 30 Apr 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print