Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Index
List of Mines
Colliery Managers
Abandoned Seams
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

 Misc. Notes Return to Index Misc. Notes 
/ \

Seaton Delaval Colliery

Miscellaneous Notes and Incidents

The question of spontaneous combustion is happily not a vital one in the Northern coalfields, but during the last year a serious fire from this cause occurred in Seaton Delaval Colliery, Northumberland.

The fire originated in a district in the Main Coal Seam, which is contiguous to a "washout" where no coal is found.

The normal section of the seam is 3 feet of top coal, 4 inches of seggar band, and 2 feet 8 inches of bottom coal, a total thickness of 6 feet with a post roof and hard seggar floor. The affected area was worked in 1907 by the bord and pillar system: the bords being 18 feet wide and -22 yards apart, and the walls 9 feet wide and 44 yards apart. The extraction of the pillars was commenced in 1908, the successive lifts being 15 feet wide.

The falls of roof in the "broken" proved the existence of an overlapping seam, about 6 feet in thickness, of the same nature as the true seam, and with a thickness of 6 feet and over of stone intervening. Some of this coal was raked out of the goaf as the lifts were worked off, but a large amount remained broken up amongst the fallen debris.

In September, 1908, after an area, equivalent to three whole pillars in extent, had been extracted, a fire was detected in the goaf. The working of the district was then abandoned and the "broken" area walled up. In June, 1915, the temperature of this area was observed to be rising, and when a brick stopping was broken through, fire was found to exist amongst the fallen material in the bord to a height of some 18 feet to 20 feet. From the middle of June towards the end of July an attempt was made to dig out the fire, but owing to the great height of the material and the excessive heat it had to be abandoned. Following this, the original brick stoppings were replaced by heavy brick and cement dams cut deeply into the floor, roof and sides. A supply of water from the surface was then forced into the heated area through the lowest dam.

During the erection of this dam three relief pipes, each 6 inches in diameter, were built through it, and the tops of these pipes reached inside to a height of 22 feet from the floor.

The strata rises from this dam some 20 feet in 88 yards. The water, therefore, gradually rose upon the fire, and steam was generated and came away through the relief pipes for four or five days. The water ultimately reached a height of 20 feet 6 inches, and the inflow never exceeded the rate of 140 gallons per minute. Before the dams were sealed a quantity of mixed clay, sand and horse dung was placed behind them, and this packing closed up the cracks in the strata as the water leaked out.

The management consider that the fire is now entirely extinguished. The temperature at one of the higher dams, after the water was put in, has fallen from 103° to 84° F.

Experiments made at the Doncaster Coal Owners' Laboratory have proved that this particular coal is very liable to spontaneous combustion; particularly the overlapping coal, which contains bands of fine pyrites.

The fire appears, in my opinion, to have originated owing to the top coal gradually falling until it reached the lowest stopping next to the intake air. This stopping was 6 feet in height, and the roof on the outbye side had fallen to a height of 10 feet, while on the inbye side the fallen coal made the height 20 feet. The portion of strata immediately over this stopping, therefore, became weakened, and cracks developed which admitted air, probably just sufficient to support combustion.

The remedy in like cases appears to be to adequately support the roof near close stoppings or proper dams, so that the strata cannot break down and allow air to get through the partings.

Source: 1915 Mines Inspectors Report

Index  index of Miscellaneous Notes and Incidents for Seaton Delaval Colliery

Colliery Page  main page for Seaton Delaval Colliery

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print