An explosion, fortunately not attended with injury to any person, occurred at the Chester South Moor Colliery, belonging to the owners of the Priestman Collieries on the 12th April, and was the subject of a formal investigation by Mr. Howard Smith, Commissioner; and Mr. G. C. Vaux appeared for the Board of Trade.
The boiler was delivered at the colliery on the 14th February, 1889, and worked from the 16th August, 1889 to 1898 when the coke ovens were built and steam was generated in different boilers from the waste gases, this and other boilers being put out of use except on rare occasions when the ovens were being repaired or at holiday times.
It was examined in August, 1901, by the enginewright and reported all right. On the 10th April, 1903, it was decided to get up steam and the boiler was examined by the enginewright, who was told to be careful as the boiler had not been worked for so long ; he did so and reported it in good order. The following day the fire was lighted at 6 p.m. and it was kept going till 8 p.m. with the safety valve raised. After that the steam pressure generally rose to 40 lbs. on the square inch, and at 3.40 a.m. on the 12th the explosion occurred.
Examination showed that the shell plate in the third strake from the front end on the left hand side, about 3 feet 6 inches round from the lower centre rim, ruptured longitudinally for about 5 feet 7 inches. It then tore circumferentially for a length of 10 feet 6 inches, the piece of plate being folded back. The cause being that the plate had been so weakened by external corrosion where in contact with the brickwork, in which a portion of the boiler was encased, as to be unable to withstand the ordinary working pressure.
The Commissioner in giving judgment said that it was evident that a proper examination had not been made by the enginewright and, if he had made a proper use of the hammer, he would have discovered the thinness of the plate, notwithstanding the fact that the defective part was impinging against the brickwork.
This boiler had been set up in brickwork some fourteen years ago and during that period no portion of it had been removed. A complete and thorough examination could not have been made unless some portion of the plates, where corrosion was most likely to exist, had been sighted. This could only be done when a portion at least of the brickwork had been removed. As the boiler had not been in use for a period of five years, the probability of the brickwork being damp largely increased, and he held that it was clearly the duty of the engineer to have directed that it should be removed and ascertained that this had been done.
Having found the engineer to blame to this extent the Commissioner held the Colliery Company to be responsible, and ordered them to pay £25 towards the costs of the enquiry.
The enquiry, which lasted two days, appears to me to be a very valuable one, and I recommend perusal to all users of steam in the district.
Source: 1903 Mines Inspectors Report (Cd 2119), Durham District (No. 4) by R. D. Bain, H.M. Inspector of Mines