Hitherto it has not been my lot to report any fires of a serious nature in connection with the surface arrangements of the collieries in my District, but this immunity was broken late on the night of November 24th, when a disastrous conflagration broke out at the Broomhill Colliery, Northumberland, resulting in an almost total destruction of the surface plant. Happily it occurred at a time when there were only two men in the pit, which was to have been off work the following day; for had the usual number of shifters been at work, it is quite possible that there might have been a serious loss of life, in spite of the numerous outlets from the workings, two of which were to the day, and it was by one of these that the two men escaped, the main winding shaft soon being rendered useless for egress.
The total number of men employed at this colliery is about 1,200, and it can be easily imagined the dismay that existed when it was seen that nothing could be done to prevent the destruction, which was accomplished in less than half an hour.
The rapidity with which the fire spread, the whole heapstead being one mass of flame within ten minutes after its first discovery, was due to the fact that the colliery has been in existence for some years, and although many modern improvements have lately been made, a large portion of the old wooden erections still remained, which readily fed the flames.
The main winding engine was seriously damaged, as was also the shaft, down which the flaming timber fell in great quantity, but fortunately without setting the surroundings at the pit bottom on fire. A descent was made as soon as possible by means of one of the drifts, and any danger that existed was promptly coped with.
It was satisfactory to find that all the horses had escaped unscathed.
Fortunately one shaft, ordinarily used for the descent and ascent of the men and boys, remained uninjured, and as soon as the fire had been entirely subdued, arrangements were made for utilizing this as a winding shaft, and with such despatch was the work carried out that a considerable number of men were enabled to resume their usual occupation in the course of a day or two. This has been increased by degrees, but it will be some months before the full complement can be employed, pending the erection of the new plant.