Bedlington Colliery
Miscellaneous Notes and Incidents
Inrush of Water : At Bedlington "A" Colliery, Northumberland, an influx of water took place in the Plessey Seam. The water came from known disused and waterlogged workings in the Low Main Seam, estimated to be 10 to 12 fathoms above. Near the end of the backshift a roof weighting occurred on a machine-cut longwall gateway face, which had just been set away from two roads driven through a 16-foot downthrow fault. At the same time water began to appear in the form of "droppers" from the roof and the "make" of water increased rapidly to 1,800 gallons per minute. No lives were endangered but the working of the Plessey Seam and of the Harvey Seam below was interrupted for more than a month until unwatering operations had been completed. It was estimated that the total quantity of water pumped amounted to about 9,000,000 gallons. The strata between the seams at the shaft were generally strong.
Source: 1935 Mines Inspectors Report
index of Miscellaneous Notes and Incidents for Bedlington Colliery
main page for Bedlington Colliery