The condition of the roof in longwall working depends largely upon the speed, regularity of advance, and systematic timbering of the working face. A hewer was seriously injured by a large fall of roof in a longwall place at Burradon Colliery, Northumberland, in circumstances which were classified as "unavoidable" under the prevailing conditions. It should be pointed out, however, that in the majority of these cases the problem is to support a block of stone, generally of uncertain lateral dimensions and of small thickness, and the failure to set adequate supports in suitable positions results in a fall of roof and a number of props canted out but not broken. It is the general experience in such cases to find that no further fall of roof has occurred when the place is visited by the Inspector, one or two days afterwards, proving that general "roof weight" took no part in the accident. The fundamental fault in many of these cases lies in the method of working and established customs. The working face is found to be in a very irregular line and props are set with a total disregard to systematic timbering so that although the hewer may scarcely have room to work between roof supports his place is insecurely timbered. Straight faces, regular advance and systematic timbering would prevent many of the so-called "unavoidable" accidents and react to the advantage of the hewer by increasing his safety and productiveness.
Source: 1927 Mines Inspectors Report