Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Photograph Gallery
Misc Images
Cumberland Mines
County Durham Mines
Northumberland Mines
Durham Miners' Gala
Adverts Gallery
Colliery Railway Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Gallery Contents Page Gallery
Sample Date Description
Thumbnail  Aug 1960 General view of the quarry face at Stainton
Thumbnail  Aug 1960 Drilling with a Halco-Stenuick machine
Thumbnail  Aug 1960 Climax tractor-mounted Vole drill
Thumbnail  Aug 1960 Plan showing the quarry face being worked, in relation to the crushing and screening plant, railway sidings and Stainton village
Thumbnail  Aug 1960 Geological map of Low Furness
Thumbnail  Aug 1960 Secondary drilling in progress
Thumbnail  Aug 1960 Offtake point from the compressed air main
Thumbnail  Aug 1960 The face before and after a primary blast
Thumbnail  Aug 1960 The face before and after a primary blast
Thumbnail  Aug 1960 Layout of typical blast and method of initiating up to ten holes
Thumbnail  Aug 1960 Connecting up a blast of more than ten holes
Thumbnail  Aug 1960 Ruston-Bucyrus 54-RB working in waste
Thumbnail  Aug 1960 Foden dumper being loaded by 38-RB
Thumbnail  Aug 1960 Dumper discharging at reception hopper
Thumbnail  Sep 1960 General view of the plant
Thumbnail  Sep 1960 Ross chain feeder controlling the flow of stone from the reception hopper, to which it is brought from the quarry face by dump truck
Thumbnail  Sep 1960 Vickers-Armstrongs 56 in. by 30 in. primary jaw crusher
Thumbnail  Sep 1960 The secondary crushing unit at Stainton, a Vickers-Armstrongs 44 in. by 36 in. roll crusher
Thumbnail  Sep 1960 The Niagara D9 twin deck vibrating screen that grades the products from the secondary crusher
Thumbnail  Sep 1960 Plant flowsheet
Thumbnail  Sep 1960 Grinding plant house
Thumbnail  Sep 1960 A view of the coke reception railway siding, ground hopper and belt feeding the kilns
Thumbnail  Sep 1960 General view of the kilns and their servicing arrangements
Thumbnail  Sep 1960 Stone being fed into a lime kiln from a 1 cu. yd. tipping truck
Thumbnail  Sep 1960 Parker Cascade sand and stone washer
Thumbnail  Sep 1960 Garage facilities established for housing the fleet of quarry vehicles
Thumbnail  Sep 1960 The Hennebique ready-mix concrete plant
Thumbnail  Sep 1960 The most recently installed unit for meeting increased pneumatic demands in the quarry, a Broom and Wade EH 241 compressor
Thumbnail  Sep 1960 New electrical sub-station, also showing the Fahr wheeled tractor that is used for internal duty throughout the quarry plant
mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print