| Sample |
Date |
Description |
| 1923 | Ashington and Lynemouth Pithead Baths |
| 1923 | Ashington and Lynemouth Pithead Baths - Plan of Interior |
| Mar 1951 | A Mavor and Coulson arcshearer at work at one of the mechanised narrow-work faces |
| Mar 1951 | Debris discharging from the chute on to the conveyor |
| Mar 1951 | A general view of No. 2 pit top during the shaft widening |
| Mar 1951 | The concrete mixers and drop-bottom kibbles at the top of No. 2 shaft |
| Mar 1951 | A view of No. 1 pit top before reconstruction |
| Mar 1951 | The existing workshops and fan evasee at Lynemouth |
| Mar 1951 | Surface Layout of Lynemouth Colliery |
| Dec 1953 | Lynemouth Colliery |
| Dec 1953 | The 1,225 h.p. Metropolitan-Vickers a.c. winder at Lynemouth colliery |
| Dec 1953 | The bank control position at Lynemouth showing car tippling control and winder control equipment |
| Dec 1953 | A control cubicle with dynamic braking speed control trays (dynamic braking tray partially withdrawn) |
| Feb 1955 | A diagrammatic view of the Lynemouth installation |
| Feb 1955 | Sectional view through a Tubix unit |
| Feb 1955 | One of the Lynemouth tipplers showing the ducting for the dust-control equipment |
| Feb 1955 | The rotary-discharge valves and the solids delivery chutes at Lynemouth |
| Feb 1955 | The control panel in the dust-collector house at the Lynemouth installation |
| Feb 1955 | Ducts delivering dust from the collection unit at Lynemouth colliery |
| Jun 1955 | Aerial view of Lynemouth Colliery and coal-preparation plant |
| | Lynemouth Colliery |