| Sample |
Date |
Description |
| Jul 1956 | An aerial view of the drifts showing the return drift entrance partly backfilled |
| Jul 1956 | Part of the pithead baths building |
| Jul 1956 | The surface buildings showing in the foreground the pithead-baths |
| Jul 1956 | The main entrance and baths building |
| Jul 1956 | The workshops and stores block |
| Jul 1956 | View of the floor of the drifts showing some of the reinforcing rods in the floor and walls |
| Jul 1956 | Entrance to the drift during drivage |
| Jul 1956 | A section of the face supported by Huwood T.C.R. props |
| Jul 1956 | Cutting with an A.B.15 longwall coalcutter |
| Jul 1956 | The central transfer point on the intake drift |
| Aug 1956 | A section of the intake drift |
| Aug 1956 | The tensionend pulleys of the cable-belt conveyor |
| Aug 1956 | Coal on its way from the top of the drift to the screening plant |
| Aug 1956 | The weighbridge and cabin |
| Aug 1956 | The driving unit of the cable-belt conveyor |
| Aug 1956 | A corner inside the stores building |
| Aug 1956 | The canteen |
| Aug 1956 | Receiving treatment in the first-aid room |
| Aug 1956 | The entrance hall in the main building |
| Aug 1956 | The interior of the lamproom, showing the storage racks and, behind them, the charging frames |