Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Photograph Gallery
Misc Images
Cumberland Mines
County Durham Mines
Northumberland Mines
Durham Miners' Gala
Adverts Gallery
Colliery Railway Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Gallery Contents Page Gallery
Sample Date Description
Thumbnail  Dec 1936 Typical working place showing extent to which the pillars supporting the "middling" are robbed before being shot out
Thumbnail  Dec 1936 Starting a drill-hole in a typical rise
Thumbnail  Dec 1936 Recovering the broken down "middling" by spilling
Thumbnail  Dec 1936 View of mist projector used for dust settling
Thumbnail  Dec 1936 Steel arch supported roadway and haulage gear at Beckermet
Thumbnail  Aug 1952 Beckermet Mine (Iron Ore)
Thumbnail  Aug 1952 No. 1 shaft bottom
Thumbnail  Aug 1952 Inside the transformer and rectifier station on the trolley locomotive system
Thumbnail  Aug 1952 A section point consisting of two dumbell-type section insulators with a switched neutral runner between
Thumbnail  Aug 1952 The north end of the trolley-locomotive system near the shaft bottom, showing the double road for the marshalling area
Thumbnail  Aug 1952 A welded-type rail bond at a track joint
Thumbnail  Aug 1952 The south (inbye) end of the trolley system, showing the crossover equipment with spring-back trail frogs and porcelain insulated supports
Thumbnail  Aug 1952 The trolley-line termination and the illuminated danger notice at the north end of the trolley-locomotive system
Thumbnail  Apr 1954 Beckermet Mine - Haile Moor Shaft
Thumbnail  Apr 1954 A development heading being drilled off with a Holman SL-200 air-leg mounted machine
Thumbnail  Apr 1954 Illustrates the girder set and corrugated sheeting used for support when driving through broken ground
Thumbnail  Apr 1954 An Eimco model 21 rocker shovel, adapted for dip working, shown at work on a 1 in 4 grade development heading
Thumbnail  Apr 1954 The Eimco 621 track-mounted rocker shovel in operation
Thumbnail  May 1954 The main underground pumping station at Beckermet No. 1 shaft showing three of the four sets which are capable of handling 3,800 gallons per minute
Thumbnail  May 1954 Two full tubs, each holding 20 cwt. of ore, are shown at No. 1 shaft bottom prior to cage hoisting
Thumbnail  May 1954 One of the Simplex Motor Rail 28 h.p. diesel locomotives used for shunting duties in the vicinity of No. 1 shaft bottom
Thumbnail  May 1954 View of the main trolley haulage road showing the 8-ton 80 h.p. Goodman locomotive employed
Thumbnail  May 1954 One of the B.E.V. battery locomotives used to transport ore from remote mining areas and to feed the trolley locomotive haulage
Thumbnail  May 1954 At the No. 1 shaft end of the conveyor bringing ore from the No. 2 shaft mining area, a train of tubs is shown being loaded prior to being taken to the shaft for cage hoisting
Thumbnail  May 1954 Pit head arrangements at Haile Moor shaft, with the empties side shown in the foreground
Thumbnail  May 1954 The aerial ropeway hoppers for loading to rail at No. 1 shaft
mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print