Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Photograph Gallery
Misc Images
Cumberland Mines
County Durham Mines
Northumberland Mines
Durham Miners' Gala
Adverts Gallery
Colliery Railway Gallery
Document Archive
Master Name Index
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Gallery Contents Page Gallery
Sample Date Description
Thumbnail  Sep 1956 One of the two Bucyrus-Erie 1150B draglines at work
Thumbnail  Sep 1956 The box-cut, 3,200 ft. long, 100 ft. wide and 230 ft. deep
Thumbnail  Sep 1956 The Euclid twin-power scraper with a struck capacity of 18 yards
Thumbnail  Sep 1956 A 58BH Joy-Sullivan air-blast rotary drill
Thumbnail  Sep 1956 A 22-ton rear-dump Euclid being loaded direct by a 22cu. yd. Hendrix bucket
Thumbnail  Sep 1956 The 40-ton bottom-dump semi-trailer used for coal hauling on the new road
Thumbnail  Sep 1956 Route of the new coal road from the site to the screens
Thumbnail  Sep 1956 The new road crossing the River Blyth and the A.189 Hartford-Bedlington road
Thumbnail  Sep 1956 An aerial view of the site workings
Thumbnail  Sep 1957 A general view of the Bebside screens from the entrance, with a 40-ton coal hauler discharging its load into the hoppers
Thumbnail  Sep 1957 Drawing showing the layout of the site
Thumbnail  Sep 1957 Two Joy-Sullivan drills in action preparing the ground for the dragline in the background. On the extreme left in the background, 22-ton Euclids can be seen tipping material loaded into them by 5-yard shovels in the advance reduction
Thumbnail  Sep 1957 A Bucyrus-Erie dragline exposing coal at the north end of the cut, casting the overburden into the previous cut. Exposed coal is being loaded by grab from one of the derricks before being placed into the waiting coal hauler
Thumbnail  Sep 1957 A loaded coal skip being hauled up by a highspeed derrick while the coal shovel is loading an empty skip
Thumbnail  Sep 1957 A Bucyrus-Erie dragline working on the low-wall side with coaling virtually completed in this portion of the cut. The second dragline can be seen in the background working the other end of the cut
Thumbnail  Sep 1957 One of the high-speed derricks loading into a coal hauler (40 tons) from a 10-ton skip which is loaded in the cut by a small coal shovel
Thumbnail  Sep 1957 A skip being loaded in the cut by a 2-yard coal shovel
Thumbnail  Sep 1957 A view of the offices at Acorn Bank
mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print