| Sample |
Date |
Description |
| Sep 1956 | One of the two Bucyrus-Erie 1150B draglines at work |
| Sep 1956 | The box-cut, 3,200 ft. long, 100 ft. wide and 230 ft. deep |
| Sep 1956 | The Euclid twin-power scraper with a struck capacity of 18 yards |
| Sep 1956 | A 58BH Joy-Sullivan air-blast rotary drill |
| Sep 1956 | A 22-ton rear-dump Euclid being loaded direct by a 22cu. yd. Hendrix bucket |
| Sep 1956 | The 40-ton bottom-dump semi-trailer used for coal hauling on the new road |
| Sep 1956 | Route of the new coal road from the site to the screens |
| Sep 1956 | The new road crossing the River Blyth and the A.189 Hartford-Bedlington road |
| Sep 1956 | An aerial view of the site workings |
| Sep 1957 | A general view of the Bebside screens from the entrance, with a 40-ton coal hauler discharging its load into the hoppers |
| Sep 1957 | Drawing showing the layout of the site |
| Sep 1957 | Two Joy-Sullivan drills in action preparing the ground for the dragline in the background. On the extreme left in the background, 22-ton Euclids can be seen tipping material loaded into them by 5-yard shovels in the advance reduction |
| Sep 1957 | A Bucyrus-Erie dragline exposing coal at the north end of the cut, casting the overburden into the previous cut. Exposed coal is being loaded by grab from one of the derricks before being placed into the waiting coal hauler |
| Sep 1957 | A loaded coal skip being hauled up by a highspeed derrick while the coal shovel is loading an empty skip |
| Sep 1957 | A Bucyrus-Erie dragline working on the low-wall side with coaling virtually completed in this portion of the cut. The second dragline can be seen in the background working the other end of the cut |
| Sep 1957 | One of the high-speed derricks loading into a coal hauler (40 tons) from a 10-ton skip which is loaded in the cut by a small coal shovel |
| Sep 1957 | A skip being loaded in the cut by a 2-yard coal shovel |
| Sep 1957 | A view of the offices at Acorn Bank |