Job Breakdown SheetsBreakdown No. 29
|
| (a) |
Hammer, pick, shovel.
|
3: Set anchor prop and sprag machine.
| (a) |
Set anchor prop in first position.
|
|
| (b) |
Set sprag near centre of machine to act as pivot.
|
|
| (c) |
Attach haulage rope to anchor prop.
|
| (a) |
Switch on the power.
|
|
| (b) |
Control machine until first position of turn is reached.
|
|
| (c) |
Switch off the power and release haulage rope.
|
| (a) |
Reset anchor prop in second position of turn.
|
|
| (b) |
Set sprag against machine to act as pivot.
|
|
| (c) |
Attach haulage rope to anchor prop.
|
6: Draw machine into position required.
| (a) |
Switch on power.
|
|
| (b) |
Control machine during turn, haulage clutch handle in flitting position.
|
|
| (c) |
Reset anchor prop and reset staker prop in various positions until machine is manoeuvred to required position. See that machine is left in a well-ventilated position.
|
|
| (d) |
Switch off power — remove cable or air hose; hang in clean dry place.
|
7: Examine work and collect tools.
| (a) |
Reset any props which have been removed.
|
|
| (b) |
Collect tools and place where safe.
|
![]() |
||||||||
|