Breakdown No. 25
Shifting a Face Conveyor
Belt Conveyor
1: Collect tools and materials required.
2: Examine the working place.
3: Check the new track.
4: Dismantle the conveyor.
5: Rebuild the conveyor in new track.
6: Tension the belt.
7: Examine completed work and collect tools.
1: Collect tools and materials required.
| |
(a) |
Collect hammer, pick, Sylvesters and chains, lifting jack and measuring rod.
|
| |
(b) |
Collect belt repairing tackle and new length of belt if required.
|
2: Examine the working place.
(See
Breakdown, No. 9, "Examining the working place — at the coalface".)
3: Check the new track.
| |
(a) |
Make sure that the new track is clear of debris.
|
| |
(b) |
See that the supports are correctly aligned so that the track is straight.
|
| |
(c) |
Mark new conveyor line on roof using measuring rod.
|
4: Dismantle the conveyor.
| |
(a) |
Run empty belt until joints in suitable position for uncoupling.
|
| |
(b) |
Switch off power and remove cable, hanging cable or air hose in clean, dry place.
|
| |
(c) |
Release the tension on the belt; uncouple belt at engine end, replace pin in coupling.
|
| |
(d) |
Roll up top belt on conveyor into suitable lengths for easy handling. Place these against face.
|
| |
(e) |
Remove intermediate sections and spill plates, placing any loose rollers in a safe place. Place sections and spill plates against goaf row of props of new track.
|
| |
(f) |
Uncouple and roll up bottom belt.
|
| |
(g) |
Remove staker props from engine end and Sylvesters from tension end.
|
5: Rebuild the conveyor in new track.
| |
(a) |
Roll out and couple up bottom belt in new track.
|
| |
(b) |
Using Sylvesters draw engine end until in required position for loading and under line marked on roof in new track.
|
| |
(c) |
Couple bottom belt to short length left round driving drums.
|
| |
(d) |
Move over stools into new track placing bottom rollers under the belt laid out along the new track.
|
| |
(e) |
Build up intermediate sections. Attach special section to engine end, where provided, align sections with line marked on roof.
|
| |
(f) |
Using Sylvesters draw tension end into correct position in new track.
|
| |
(g) |
Couple bottom belt to short length left round return drum.
|
| |
(h) |
Connect intermediate sections to tension end with telescopic pan if provided.
|
| |
(i) |
Roll out and couple up top belt on intermediate structure.
|
6: Tension the belt.
| |
(a) |
Stay down the engine end by placing stays from the engine to the roof.
|
| |
(b) |
Set anchor props and fix Sylvesters between the props and the tension end: one each side.
|
| |
(c) |
Operate the Sylvester levers and apply tension to the belt.
|
7: Examine completed work and collect tools.
| |
(a) |
Check that the structure has been carefully aligned.
|
| |
(b) |
Couple up the cable or air hose, switch on the power.
|
| |
(c) |
See that the top belt runs on the top rollers, if not, pack up the sections.
|
| |
(d) |
See that the belt rides within the sections, if not, pull over the conveyor or engine end until it does so.
|
| |
(e) |
See that the stools do not rock about and that all rollers are free to rotate. Replace where necessary.
|
| |
(f) |
Apply extra tension to the belt if required.
|
| |
(g) |
Switch off the power after say 15 minutes. If all is in order collect tools and place where safe.
|