Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
What's new in the site
Donate to support the Museum
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


Education Prev Page Return to Index Next Page Education
/   \

Job Breakdown Sheets

Breakdown No. 25

Shifting a Face Conveyor

Belt Conveyor

1: Collect tools and materials required.
2: Examine the working place.
3: Check the new track.
4: Dismantle the conveyor.
5: Rebuild the conveyor in new track.
6: Tension the belt.
7: Examine completed work and collect tools.

1: Collect tools and materials required.

  (a) 
Collect hammer, pick, Sylvesters and chains, lifting jack and measuring rod.
  (b) 
Collect belt repairing tackle and new length of belt if required.

2: Examine the working place.

(See Breakdown, No. 9, "Examining the working place — at the coalface".)

3: Check the new track.

  (a) 
Make sure that the new track is clear of debris.
  (b) 
See that the supports are correctly aligned so that the track is straight.
  (c) 
Mark new conveyor line on roof using measuring rod.

4: Dismantle the conveyor.

  (a) 
Run empty belt until joints in suitable position for uncoupling.
  (b) 
Switch off power and remove cable, hanging cable or air hose in clean, dry place.
  (c) 
Release the tension on the belt; uncouple belt at engine end, replace pin in coupling.
  (d) 
Roll up top belt on conveyor into suitable lengths for easy handling. Place these against face.
  (e) 
Remove intermediate sections and spill plates, placing any loose rollers in a safe place. Place sections and spill plates against goaf row of props of new track.
  (f) 
Uncouple and roll up bottom belt.
  (g) 
Remove staker props from engine end and Sylvesters from tension end.

5: Rebuild the conveyor in new track.

  (a) 
Roll out and couple up bottom belt in new track.
  (b) 
Using Sylvesters draw engine end until in required position for loading and under line marked on roof in new track.
  (c) 
Couple bottom belt to short length left round driving drums.
  (d) 
Move over stools into new track placing bottom rollers under the belt laid out along the new track.
  (e) 
Build up intermediate sections. Attach special section to engine end, where provided, align sections with line marked on roof.
  (f) 
Using Sylvesters draw tension end into correct position in new track.
  (g) 
Couple bottom belt to short length left round return drum.
  (h) 
Connect intermediate sections to tension end with telescopic pan if provided.
  (i) 
Roll out and couple up top belt on intermediate structure.

6: Tension the belt.

  (a) 
Stay down the engine end by placing stays from the engine to the roof.
  (b) 
Set anchor props and fix Sylvesters between the props and the tension end: one each side.
  (c) 
Operate the Sylvester levers and apply tension to the belt.

7: Examine completed work and collect tools.

  (a) 
Check that the structure has been carefully aligned.
  (b) 
Couple up the cable or air hose, switch on the power.
  (c) 
See that the top belt runs on the top rollers, if not, pack up the sections.
  (d) 
See that the belt rides within the sections, if not, pull over the conveyor or engine end until it does so.
  (e) 
See that the stools do not rock about and that all rollers are free to rotate. Replace where necessary.
  (f) 
Apply extra tension to the belt if required.
  (g) 
Switch off the power after say 15 minutes. If all is in order collect tools and place where safe.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print