Breakdown No. 10
Examining the Working Place
(B) In the Roadway
1: Examine the roof.
2: Examine the sides.
3: Examine the sup ports.
4: Test for gas.
5: Examine machinery, cables, etc.
1: Examine the roof.
| |
(a) |
Test the roof by sounding it with a pick. A dull sound denotes broken or unsafe roof which should be given extra support. Pull down loose or unsafe stones.
|
| |
(b) |
Set temporary props if required.
|
| |
(c) |
Insert extra covering material above the roadway girders, if required.
|
| |
(d) |
Extend the forepoling if required to secure the roof in advance of the roadway supports.
|
2: Examine the sides.
Examine the sides for loose or unsafe stones. Pull these down and secure with suitable covering material placed behind the roadway supports.
3: Examine the supports.
| |
(a) |
See that the supports are set in accordance with the Colliery Support Rules.
|
| |
(b) |
Ensure that all supports are set to a line marked on the roof.
|
| |
(c) |
See that struts are inserted between the supports. (d) Replace any damaged supports where necessary.
|
4: Test for gas.
| |
(a) |
Test for gas within the limits of the working place, in any cavity or break in the roof.
|
| |
(b) |
Withdraw and report immediately the presence of any gas to the deputy or official in charge.
|
5: Examine machinery, cables, etc.
| |
(a) |
Ensure that all machinery or cables are properly protected where work to be undertaken may cause damage to them.
|
| |
(b) |
Ensure that everything is in order and that the structure is correctly aligned before switching on the motor of the conveyor.
|
| |
(c) |
Ensure that the cable and switch gear are not damaged in any way before switching on the power.
|