|
Fishburn Coking Plant
DescriptionThe plant, built in 1954, to replace older works at Fishburn and Thrislington, consists of 50 Woodall-Duckham underjet compound silica ovens with provision for the addition of lean gas mains etc. When operating at a coking time of 20 hours, the plant has a capacity of 365,000 tons per annum of washed smalls, of which up to 60% is delivered by conveyor from Fishburn Colliery and the remainder from East Hetton and Trimdon Grange Collieries There are twenty blending bunkers, each of 200 tons capacity. Mainly furnace coke is produced, there are good landsale facilities and capacity for stocking and reclaiming 100,000 tons of coke. 7 million cubic feet of purified gas per day, at a standard calorific value of 500 B.Th.U. per cubic foot, are compressed and supplied to the Northern Gas Board’s gas grid. The cost of purification (as at all the five N.C.B. coking plants in the Division supplying purified gas) is borne by the Gas Board. Steam is raised in water tube boilers fired with coal and coke breeze and fitted with burners for gas or tar fuels. Water for the boilers and gas cooling is obtained from Fishburn Colliery. Part of the works effluent is utilised for coke quenching etc. and the remainder is treated in a plant of the continuous culture type. Coking Plants, 1964 Disasters (5 or more killed)None found. Names of those killed at this collieryNo names found. Collieries and Pits within 5 miles (8km)
Gallery Images:
CreditsSources:
Pictures:
Related Links:
|
|||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 31 Dec 2022
|
Search |
|
|||