|
Acorn Bank Opencast Site — Part 2Drawings and Photographs accompanying the article Fig. 4. A Bucyrus-Erie dragline exposing coal at the north end of the cut, casting the overburden into the previous cut. Exposed coal is being loaded by grab from one of the derricks before being placed into the waiting coal hauler
Fig. 4. A Bucyrus-Erie dragline exposing coal at the north end of the cut, casting the overburden into the previous cut. Exposed coal is being loaded by grab from one of the derricks before being placed into the waiting coal hauler Image Reference: L-00549-03-0065-F04 Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian. |
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 17 Jan 2023
|
Search |
|
|||