| Sample |
Description |
| Fig. 1 — The Sullivan-slusher hauler at work on one of the faces at Linton colliery |
| Fig. 2 — Using a Pikrose portable hauler to withdraw supports in a disused gateroad |
| Fig. 3 — Withdrawing steel arches by means of a Pikrose hoist |
| Fig. 4 — A typical section of haulage road illuminated by Victor fittings |
| Fig. 5 — A rail-mounted A.B. arcwaller making a cut at one of the faces of the new pit-bottom headings |
| Fig. 6 — Plan and elevation of the new pit bottom at Linton colliery, showing the construction at the shaft inset |
| Fig. 7 — Cross section showing the construction of the shaft inset in the new pit bottom, Linton Colliery |
| Fig. 8 — Plan of the new pit bottom |
| Fig. 9 — Isometric representation of the new pit bottom at Linton colliery |
| Fig. 10 — Plan of the Five Quarter Seam showing the direction of the proposed arterial roads |
| Fig. 11 — Diagram of the automatic control system to be used on the electric winders |
| Fig. 12 — Plan of the reorganised surface mine-car circuit at Linton colliery |