Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Engineer - Main Index
The Colliery Engineer - Subject Index
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
 Colliery Engineering July, 1927 

Wearmouth Colliery.

This colliery is not only the oldest owned by the company but can also claim to be the oldest of the East Coast collieries in the county of Durham, sinking operations, which occupied seven years, having been started exactly 100 years ago. Here the problem was to dispense with the use of steam for operating the underground haulage's and to utilise the existing gear as much as possible in converting to an electric drive. Suitable extensions have also been made to deal with future requirements as regards pumping, which will be done eventually by electrical power. Fig. 2 shows the lay-out of the cables and switch-gear.

As already stated the current is taken from the Sunderland Corporation, the supply being brought into the colliery yard from the corporation supply in the main street. A suitable switch-house is provided by the consumers to which the high tension cable at 5,000 volts is connected, this station being equipped with high-tension switchgear and metering apparatus by Ferguson & Pailin Ltd.

From the switch-house the current is taken through the colliery yard by two three-core cable's to a sub-station placed in close proximity to the shaft, the stub-station being an exact duplicate of that at Hylton Colliery. It contains the high-tension switches controlling two transformers of 800 k.v.a. each, transforming from 5,000 volts to 2,750 volts. High-tension and 3,000-volt switchgear, together with the whole of the switchgear in this pit, has been supplied by A. Reyrolle & Co. Ltd., Hebburn-on-Tyne, and is of their latest design. This comprises two incoming isolating link panels to take the Corporation Supply from the high tension side, and there are also two transformer panels for controlling the supply to the two transformers switchgear controlling the supply to the pit consists of four panels, comprising two panels to control the 2,750-volt side of the transformers, and two panels to control feeders to pit.

Cables conveying the high-tension current from the sub-station at the boundary of the consumer's property to the distribution stub-station into the colliery yard consist of two lengths, each 270 yards, of three-core, paper-insulated, lead-covered, double wire-armoured cables, designed for a working pressure of 6,600 volts. The cables are provided with suitable cover boards and laid direct in the ground.

Shaft and Distribution Cables.

The length of each of the main cables from the distribution sub-station near the pit top to the main distribution board underground is 698 yards. Each cable is of the three-core, paper-insulated, lead-covered, double wire-armoured type.

The cables in the shaft are supported by wood cleats placed approximately 25 yards apart. In this instance the cleats are carried on girder buntons and are not fastened to the shaft wall as at Hylton. Link disconnecting boxes at insets are again used, however, as shown on the diagrammatic drawing (Fig. 2). It is the intention of the management td) take the cables to the Harvey Seam at a later date.

The distribution board for the Hutton Seam is placed in a special house built in the side of the road, and consists of :—

2 incoming panels.
1 panel for main shaft pump.
1 panel to "A" Pit North West haulage.
1 panel to Harvey staple winder.
1 panel to "A" Pit Hutton haulage.
1 panel to South East Maudlin haulage.
1 panel to South West Maudlin haulage.

These panels are all of the draw-out mining type by Reyrolle & Co. Ltd., provided with leakage tripping equipment. The general run of the cables in connection with the whole of the haulages can he followed by reference to the diagram.

Conversion of Harvey Staple Winder.

The depth of this staple pit is 56 yards and some 30 tons per hour are raised from the Harvey Sea in to the Hutton Level. Single-tub cages are used, the tubs containing about 10 cwt. of coal and having a tare of 5 cwt. Formerly a steam engine, having twin cylinders 10 in. in diameter by an 18-in stroke, was used in conjunction with the existing equipment which has now been successfully adapted to an electric drive. As will be seen from Fig. 13, a combination of machine-cut helical gearing has been introduced, this being carried by the cast-iron bedplate supporting the motor. The gearing is provided with couplings on the motor sidle and also the winder side, to couple on to a new shaft which takes the place of the former crank shaft.

The motor for operating this gear is of the three-phase slip-ring type designed for 500 volts, 50 cycles, and a speed of 485 r.p.m. It is a 75-h.p. continuously rated machine capable of developing 150 h.p. before breaking out of step.

Current is provided by a 150-k.v.a. Ferranti transformer installed in the main distribution switch-house underground, which transforms the voltage from 2,750 to 500 volts. The controller is of the Allen West oil-immersed type. We understand that the whole combination Is working exceedingly well and is giving every satisfaction.

Haulage in "A" Pit Hutton Seam.

The outline drawing (Fig. 4) shows the method of conversion of the gear, which is a tandem main and tail haulage. It will be noted that the diameter of the main drum is 6 ft., and the diameter of the tail drum 5 ft., the width in either case being 18 in.

Prior to the conversion these were operated from a compressed air engine, each drum being driven from the crankshaft by a central pinion. In order to arrange the conversion, the crankshaft of the engine was removed and a new and longer shaft was provided 6 in. in diameter. The outer end is supported by a bearing in a wall box and two additional self-oiling bearings have been provided to take the place of the old crankshaft bearings.

Upon this shaft a rope wheel in halves has been fitted 10 ft. diameter, and in this instance twelve Dawson's "Linconia" V balata belt ropes are used instead of cotton ropes, as in the other haulage's, which are supplied with 14 ropes 1¼. in. diameter. Power is provided by a threephase slip-ring motor, similar to those used for the other haulages, which runs under the following conditions :—

Effective Purse-power on continuous rating 250
Horse-power before breaking out of step 625
Volts 2,750-3,000
Cycles 50
Revs. per minute 485

It is controlled by means of a three-pole oil-filled main switch of the mining type, as already described.

Fig. 9 shows the manner in which the A pit northwest haulage was converted. Formerly this was driven by a steam engine, having two cylinders each 23 in. in. diameter by a 4-ft. stroke. The following table gives the main dimensions and chief operating conditions :—

Diameter of drum 5 ft 11 in.
Diameter over drum sides 8 ft. 8 in.
Width of drums 2 ft. 1 in.
Length of road 3,200 yds.
Revs. of drum per min. 36
Circumference of rope 2¼ in.
Number of tubs per train 60

A new pinion and rope pulley, carried on a shaft and suitably mounted on pedestal bearings, has been fitted to the existing equipment.

The main and tail haulages for South West and South East Maudlin districts are entirely new. In both instances the haulage's are exact duplicates of the new main and tail haulage at Hylton Colliery, and the same description is applicable (see Fig. 10).

Horse-Power of Haulages.

Before deciding to adopt a standard size of motor, the question of the horse-power required for each of the haulages was very carefully investigated and the following table gives the various horse-power as estimated :—

"A" Pit Hutton  240 h.p.
"A" Pit North West 230 h.p.
South West Maudlin 175 h.p.
South East Maudlin Road No. 1 250 h.p.
South East Maudlin Road No. 2 215 h.p.
Main shaft pump 160 h.p.

Needless to say, in making these estimates adequate consideration was given to any possible future developments and extensions. The powers are sufficient to deal with the full load on each road under normal running conditions and to have sufficient additional capacity to provide for acceleration and for any contingencies that might arise due to tubs coming off the road, or any other cause.

In considering the whole of the work in connection with the electrification of the two collieries, the consulting engineers have had in mind the desirability of making the' motors interchangeable. The conversion of existing haulages from compressed air to electric drive afford a clear example of how such work can be carried out with success yet with a minimum of expense. In conversions of this description it is necessary to consider carefully the fact that old haulage gears are not so rigid as new gears designed for direct gearing to the motor, but the use of ropes between the motor and the haulage gears gives the essential elasticity and ensures very satisfactory running.

It may be mentioned that many examples of conversions of this kind which have been carried out by Messrs. W. C. Mountain, Son & Wood have been running for a very long time without any renewal of the ropes.

Other points in the scheme worthy of notice are that the whole of the controllers are duplicates and therefore interchangeable moreover, the shaft cables are duplicated, which is a feature that cannot be too highly recommended as it ensures continuous operation, although with well designed and properly-supported cables the risk of trouble is very small. In conclusion, we may say that the haulages have now been in operation for two months and have given the management every satisfaction.

Drawings and Photographs accompanying the article

 

Prev Page Return to Top of Page Next Page

Article reproduced from a copy of the magazine held at National Mining Museum Scotland, Newtongrange, Midlothian.

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 17 Jan 2023

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print