Manvers Main coking and byproducts plant
A description is given of the National Coal Board’s largest coking centre.
Manvers Main has been a coke-oven site for just over half a century. In 1906 a battery of thirty-six Koppers regenerative ovens was put to work: in 1912 a battery of fourteen Simon-Carves waste heat ovens was built, and in 1917 twenty-two similar ovens were added. During the depression of the 1930’s it was decided to remodel the entire plant, and Simon-Carves received an order to build thirty rich gas underjet ovens on the site of the old wasteheat ovens, together with a new byproduct plant; the byproduct plant and the coal and coke handling plants had sufficient capacity to deal with an extension of the battery, and in 1934 another fifteen SimonCarves ovens were ordered.
When the coal industry was nationalised the National Coal Board therefore took over forty-five ovens and ancillary plant. It also took over contracts with neighbouring gas undertakings, who sold much of the gas for industrial purposes.
Though not unduly old in years, the batteries had suffered under arduous war-time conditions and needed rebuilding, which had to be done in stages in order to maintain gas supplies. The first stage was to build a new battery of seventeen Simon-Carves compound ovens. The 15-oven battery was then rebuilt; this was followed by the rebuilding of the 30-oven battery, which was remodelled as two blocks of thirteen and fourteen ovens respectively, only the first ot these blocks being put in hand at the time. All the rebuilt ovens retained the rich gas heating system.
The rebuilding was finished in 1953. When the old ovens were pulled down the 15-oven battery had carbonised just over 123,000 tons per oven and the 30oven battery just over 150,000 tons per oven.
Under the colliery development scheme which was being planned during the rebuilding of the ovens it was decided to put up a central coal preparation plant at Manvers Main to handle all the coal from the Manvers, Wath, Kilnhurst and Barnburgh collieries; the coal from the first three was to be wound at Manvers and that from the last brought overland. The estimated output of saleable coal from this plant was 12,000 tons a day, which meant that a large tonnage of coking smalls would be available within conveyor distance of the ovens; for this reason, and because the plant was geographically well placed with respect to the gas grid, the logical decision was taken to increase the carbonising capacity at Manvers as much as possible. The final layout provided for a throughput of about 3,000 tons a day, which makes Manvers the National Coal Board’s biggest coking centre. The central coal preparation plant will be described briefly in the second part of this article.
The site is not ideal, for the only ‘sterilised’ ground in the neighbourhood is that on which the old plant stood and some land adjoining it; moreover the site is cut into four by the main Sheffield-Leeds railway line and the Wath Curve, an important mineral line. The only land suitable for oven extensions lies southwest of the main line and is cut by the Wath Curve; the existing ovens and byproduct plant occupy almost all the land on the north-western side of the Curve, leaving only a triangle between the Curve and the main road for the new ovens and byproduct plant.
Every detail of the expansion was planned with great care on the guiding principles of economy of space, efficient operation, flexibility, etc.
The coal preparation plant treats high, medium and low rank coals, three rows of blending bunkers being provided so that each type of coal can be kept separate and can he blended as required. There are two service bunkers, one serving the old ovens and the other the new ones, and since the two oven sites have separate coke wharves it was possible to arrange the coke plant so that coke from the two sites can be kept separate. This enables two different types of coke, such as blast furnace coke and domestic or industrial coke, to be separately produced, stocked and handled. Provision is made for a large stocking area on the ground, with reclaiming facilities.
As so large an installation amply justifies careful planning of energy requirements, it was decided that it should be self-contained with its own steam and electric power plant. Steam generated at 625 lb. per sq. in. and 815°F passes to back-pressure turboalternators and is exhausted at 160 lb. per sq. in. to the prime movers of the coke-oven plant and certain other sections of the colliery; process steam for the byproduct plant is obtained by using back-pressure turbines as prime movers.
The coke-oven batteries
The extension of the old site was limited by the need to retain the small oven dimensions originally chosen, which were as follows :—
| Length over oven sole | 38 ft. 6 in. |
| Chamber height | 13 ft. 3 in. |
| Mean width | 1 ft. 6 in. |
| Weight per charge | 14 tons as charged |
Besides the seventeen new compound ovens and the rebuilt blocks of fifteen and thirteen rich-gas ovens, the final fourteen ovens of the old 30-oven battery were rebuilt, and an additional block of twelve new compound ovens was added. This gave a throughput of about 1,320 tons of coal a day. A new chimney was built to serve all the seventy-one ovens on the old site, the former chimney being demolished to make room for a spare ram.
On the new site a new battery of sixty-six ovens was built in two blocks of thirty-three. As no restrictions were imposed by existing oven machinery, the following larger dimensions were chosen :—
| Length over oven sole | 44 ft. 7 in. |
| Chamber height | 14 ft. 9 in. |
| Mean width | 1 ft. 5¾ in. |
| Weight per charge | 178 tons as charged |
This battery has a throughput of 1,570 tons a day.
In order to save valuable ground space the ram track of this battery is carried about 19 ft. above ground level on reinforced concrete columns and beams; the space below is enclosed by brick walls and provides locker rooms, shower rooms, mess rooms, workshops and an electric substation.
The new battery has two complete sets of oven machinery incorporating the latest improvements. The travel motors of the ram machines have ‘Microsen’ gear, which enables the machines to be centred quickly and smoothly with complete absence of the tendency to jump inherent in normal inching controllers. The ram beam can be operated at reduced speed by a compressed-air motor in case of power failure, compressed air being supplied from the colliery. The coke guides and coke side door extractors are separate machines with their own travel drives; these machines and the ram machines all have mechanical lifts for attending to the doors.
The charger cars are of the usual portal frame type, but their suspension is particularly interesting. The travelling wheels are mounted in bogies, the bogie frames being riveted to the chassis on one side and mounted on the other side in pin bearings with hydraulic dampers; the three-point suspension thus provided evens out the load and prevents ‘crabbing’ and vibration. The practical absence of vibration greatly reduces wear and tear on the oven top brickwork, and so silent is the travel of the machine that the usual mechanically operated bells are replaced by special warning bells which sound at the first movement of the travel controller.
All the machines operate on 110 V 3-phase a.c. supply, which greatly reduces the danger from the trolley wires.
On the old site a new set of machines has been provided, so that two sets are now available. The old ram machine, which formerly used direct current, was converted to take the 110 V 3-phase a.c. supply.
Oven doors. The plant has self-sealing doors throughout, and the 12-oven, 13-oven and 14-oven batteries on the old site and the new 66-oven battery have a new type of latch gear. The main feature of this door, known as the G type, is that it is tightened on to its seating by its own weight instead of by the conventional rose and screw. As shown in Fig. 7, two toggle arms are pivoted to the door body; these engage with the latch hooks, and the weight of the door acting through the toggle arms forces the sealing strip on to its seating. To remove the door the extractor takes the weight in the normal manner, and the toggle arms are then raised until the latch bars are clear of the hooks by turning a handwheel which operates a screw-jack in the linkage between the arms; the door is then withdrawn in the usual way. To replace it the process is reversed.
The G type door has the advantage that the closing force is constant, thus avoiding strain on the latch hooks and sealing strips. The North Eastern Division of the National Coal Board has pioneered the use of these doors, which are fully satisfactory in operation and remain gas-tight even when high-volatile Yorkshire coal is being carbonised.
Coke handling and screening
As already mentioned, the batteries on the old and new sites have separate conveying systems to the main coke screen house, so that different types of coke can be kept separate if necessary.
The wharf conveyors from the old and new sites meet at a junction tower beside the main railway line, from which two conveyors cross the railway in a single gantry to another junction tower on the far side; two further conveyors lead thence to the main screen house, where each conveyor feeds its own line of grizzley screens for run-of-oven coke. The screen house is of reinforced concrete and is provided with overhead travelling and jib cranes to handle the coke cutting and screening equipment. For ease of maintenance there are standby screens mounted on rollers running on rail tracks.
Overs from the grizzley screens may be delivered either to rail wagons by boom loaders or to the stocking ground. Throughs (under 2½ in.) may be fed either to secondary screens or to the stocking ground. A proportioning device enables some or all of the runof-oven coke to bypass the grizzley screens and to be fed through a cutter to the secondary screens or to the stocking ground.
The secondary screens are fed from a distributing hopper with three outlets, each outlet having a vibrating feeder delivering to a double-deck vibrating screen. Throughs from these three screens are conveyed to a second stage comprising three more double-deck screens. Graded coke from the secondary screens is conveyed to domestic bunkers adjoining the main screen house; the bunkers have five 30-ton compartments to accommodate coke breeze and four sizes of nuts, and they can deliver graded coke either by vibrating feeders and de-breezing screens to rail wagons, or by conveyor to the stocking ground, or by conveyor to the boiler house hoppers. The boiler house can also receive coal from the washery.
Run-of-oven or screened coke can be handled in and out of stock at 200 tons an hour. Coke for stocking out is conveyed to the feed hopper of an aerial ropeway system; alongside the delivery conveyor is a reclaiming conveyor fed from the ropeway through a buffer hopper. Reclaimed coke can be delivered either to the grizzley screens or to the domestic bunkers.
Provision is made for delivering coal or coke to space-heating boilers located near the line of the boiler house conveyor, and this conveyor will be extended to feed the future producers.
Adjacent to the contactor room of the main screen house is a control desk with a mimic panel, consisting of a geographical line diagram of the whole coke handling and screening plant with indicator lights to show the actual flow of coke. The required flows are brought into operation from the control desk.
Byproduct plant
The old site did not allow any byproduct plant extension to handle the greatly increased gas volume. A new byproduct plant was accordingly built on the south-west side of the Wath Curve to handle the gas from the new 66-oven battery and from the rebuilt 13-oven and 14-oven batteries on the old site. The foul gas mains from the latter two cross the Wath Curve by a pipe bridge and join the foul gas mains of the 66-oven battery at the inlet to the primary condensers. The new byproduct plant thus receives the gas from the carbonisation of about 2,000 tons of coal a day, leaving the old byproduct plant to handle a gas volume slightly lower than before.
The general layout of the two byproduct plants and connecting gas mains is shown in Fig. 11.
The old plant comprises primary condensers, exhausters, detarrer, ammonia scrubbers and benzole scrubbers; gas for heating the ovens on the old site is taken from the outlet of the benzole scrubbers via two Askania governors. Surplus gas enters the outlet main of the new byproduct plant. Liquor from the ammonia scrubbers is worked up in a concentrated ammonia liquor plant built on the new site by Chemical Engineering Wiltons Limited, a Simon-Carves subsidiary company.
The new byproduct plant comprises primary condensers, exhausters, detarrers, semi-direct saturators, direct secondary coolers and benzole scrubbers. At the point where gas from the old site is received an existing gasholder is connected to the main to act as a balance holder; the main divides into two branches, one of which delivers heating gas to the 66-oven battery via an Askania governor while the other delivers surplus gas to the final naphthalene washers. From the outlet of these washers the gas is again divided; about 4 million cu. ft. a day is pumped unpurified to Swinton and Mexborough for the Gas Board, while the remainder is boosted through the tower purifiers on the northeastern side of the main railway line, returning to the compressors which deliver to the gas grid. A three-lift spirally guided gasholder of 750,000 cu. ft. capacity acts as a balance holder on the outlet of the purifiers. Provision is made for dilution of all surplus gas by producer gas, but the producers are not yet installed. A description of the dilution plant which is to be erected will be given in the second part of .this article.
Considering the plant units in more detail, there are five vertical water-tube condensers (one a spare) working in parallel, with provision for a sixth. There are two turbo-exhausters (one spare) driven by back-pressure steam turbines; an Askania governor is fitted in the inlet main, and the turbines have the usual mechanical governors. The detarrers are of standard Simon-Carves tube type with riveted shells each containing 129 treater tubes. From the detarrers the gas passes to two saturators, one of which is spare; the liquor still is located near the concentrated ammonia liquor plant and will be described later. Salt from the saturators is elevated to a settling cone feeding either of two Watson Laidlaw horizontal centrifuges, from which it is conveyed to a Dunford & Elliott dryer in the salt store; the dried salt is elevated to a hopper, from which it can be bagged or loaded by belt to wagons or to stock. Recovery from stock is by belt conveyor.
Gas from the saturators enters the direct secondary cooling towers, of which there are two in series, a naphthalene washing section being included. The cooled gas passes to three benzole scrubbers in series; the scrubbers have wooden grid fillings, and the washing medium is creosote oil.
The concentrated ammonia liquor plant, though located on the new site, handles the liquor from the ammonia scrubbers of the old byproduct plant; it also includes the still for the liquors from the new plant, and a suitably lagged 10 in. diameter vapour line carries the still vapours to the gas main at the inlet to the saturators. Both stills are served by a single liming plant, which is designed to receive quicklime from L-type rail containers and to handle it with the minimum of labour and supervision as the most economical method of producing milk of lime for the stills.
The gas handling plant on the outlet of the benzole scrubbers is common to both byproduct plants, and as already stated the heating gas for the batteries is taken from this main, to which the balance holder is connected; a connection is also taken to the gas bleeder, a triple stack mounted on the service bunker of the 66-oven battery. The surplus gas passes to two static ring-packed naphthalene washers in parallel; these each have, six washing chambers with corresponding circulating pumps. The washing medium is gas oil, which is regenerated in a plant adjoining the washers. The dilution gas main will be connected to the outlet of the naphthalene washers, and provision is made for automatic regulation of the calorific value of the diluted gas.
The greater part of the gas from the naphthalene washers passes to two blowers (one spare) located in the exhauster house and driven by flame-proof electric motors. The blowers deliver the gas to six Holmes tower purifiers using iron oxide; this installation is complete with charging and discharging apparatus and plant for making up and storing fresh oxide charges, and there is provision for future extension of the purifiers if necessary.
On the outlet of the purifiers is a connection to a 750,000 cu. ft. gasholder which acts as a balance holder on the inlet to the compressors; a safety governor prevents overfilling of the holder and also shuts off the main before the holder is empty so that the compressors cannot pull in the crown. The purified gas passes via a Connersville gas meter to the compressors which deliver to the gas grid. Four compressors are installed, with space for two more, each having a capacity of 6 million cu. ft. a day. Of the four existing machines one is steam driven, one electrically driven, and two dual-driven, the electric motors being housed in a separate motor room with drives through gas-tight glands in the wall; this driving arrangement enables varying gas loads to be handled with the utmost economy of steam and electricity and without using variable-speed motors. The compressed gas is cooled in indirect after-coolers, from which it passes straight to the grid mains for distribution.
The unpurified gas supply to Swinton and Mexborough is taken off the inlet to the purifier boosters and passed through its own Connersville meter to either of two compressors of 4 million cu. ft. a day capacity; one compressor has electric drive and the other dual drive, the motors being housed in the same motor room as those of the purified gas compressors. Two indirect after-coolers are provided on the outlet.
A detailed list of contractors will be included in the second part of this article.