Museum Entrance Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal Magazine - Main Index
Coal Magazine - Subject Index
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious

Title Prev Page Return to Index Next Page Title
 
Masthead
December, 1956

A Mobile Winding Unit

A mobile winding unit, specifically designed as a safety unit to extricate miners from pits in the event of the shaft gear becoming immobilised for whatever reason has been demonstrated at Newburgh colliery.

Originally conceived in war-time as a stand-by plant in case of enemy action, the unit was produced by Robey & Co., Lincoln, and English Electric Company.

The prime mover of the winder is an English Electric six-cylinder naturally-aspirated diesel engine of the 'H’ series, the engine having a bore and stroke of six inches and eight inches respectively. Rated output is 195 bhp at 1,250 rpm.

In operation the winder is coupled to a large towing vehicle which carries the diesel generating set and the trailer contains the mobile winder equipment. Towing vehicle and trailer are electrically connected.

The winder is equipped with the Robey-Crompton positive power brake, is controlled on the Ward Leonard system, and is designed to sustain a rope end load of two tons at maximum speed of eight feet per second for winding depths up to 3,000 feet.

The equipment was shown as having tyred road wheels, but it can be fitted with steel wheels for travel on standard gauge rails. The towing chassis was supplied by ACV Sales, Ltd. (The mobile winding unit is pictured below.)

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 20 Feb 2012

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print