The Little Extra
Deaf Hill Colliery has a proud tradition. Over a long period the men produced 23 cwt. per manshift, one district on a scraper-loader face producing over 23 tons per manshift for a period of twelve months.
In another district at Deaf Hill the men have averaged 42 to 45 eight-cwt. tubs per manshift on a double unit beltface, though they have an hour’s travel to and from the shift and a twenty-minute break for bait — leaving only five hours and ten minutes for actual work.
There is real co-operation in this colliery. If a filler misses his call (and at 2 a.m. this can happen to anybody) his mates pull out a little extra effort and fill up to fifty-two tubs per man — 20 tons apiece — so that no coal is lost.