In the Lancashire Coal-field argillaceous Ironstones occur in several parts of the Coal-measures, but not in such abundance as to have led to their extraction for smelting purposes.
ANALYSIS. — The following results are from fair average samples :— Weardale Ore, Rispey, by A. Dick. — Protoxide of Iron, 49.47; protoxide of manganese, 2.42; alumina, trace; lime, 3.47; magnesia, 3.15; carbonic acid, 37.71 ; phosphoric acid, trace; silica, 1.20; sulphuric acid, trace ; bisulphide of iron, 0.08 ; organic matter, trace ; insoluble matter, 3.77 — 101.27. Iron, total amount, 38.56. Cleator Moor Hematite, by A. Dick. — Peroxide of iron, 95.16; protoxide of manganese, 0.24; lime, 0.07; phosphoric acid, sulphuric acid, and bisulphide of iron, a trace; insoluble residue, 5.68 — 101.15 (Insoluble residue — silica, 5.66; alumina, containing a trace of iron, 0.06 — 5.72). Iron, total amount, 66.60. Cleator Moor Iron Ore, by A. Dick. — Peroxide of Iron, 90.36; protoxide of manganese, 0.10; alumina, 0.37; lime, 0.71; magnesia, 0.06; phosphoric acid and sulphuric acid, a trace; bisulphide of iron, 0.06; insoluble residue, 854. (Insoluble residue — silica, 7.05 ; alumina, 1.06; peroxide of iron, 0.19; lime, trace — 8.30). Iron, total amount, 63.25. Gillbrow Ore, Ulverstone, by A. Dick — Peroxide of iron, 86.50; protoxide of manganese, 0.21 ; lime, 2.77; magnesia, 1.46; carbonic acid, 2.96; phosphoric acid, trace ; sulphuric acid, 0.11 ; insoluble residue, 6.55. Iron, total amount, 60.55. Hematite, Lindale Moor, near Ulverstone, by J. Spiller — Peroxide of iron, 94.23; protoxide of manganese, 0.23; alumina, 0.51; lime, 0.05; magnesia, trace; phosphoric acid, trace; sulphuric acid, 0.09; bisulphide of iron, 0.03; water, hygroscopic, 0.39; do. combined, 0.17; insoluble residue, 5.18 — 100.88. Iron, total amount, 65.98.
Blast Furnaces and Iron Works.
DURHAM. — In the county of Durham there are fifty- eight Iron Works having blast furnaces. — The Birtley Iron Works and Rolling Mills, belonging to the Birtley Iron Company, are situated about 4 miles south of Newcastle; there are three blast furnaces, erected 1827-8, intended for the smelting of the Ironstone of the Coal-measures at Ouston, Birtley, and in the immediate district. Soon after the erection of these works, Mr. B. Thompson, then the managing partner, had the Cleveland coast examined with the view of increasing his supplies of ore (in addition to the Scotch stone), as a mixing stone, and when the Whitby and Pickering Railway was opened, a trial cargo, consisting of 55 tons of Ironstone, was sent to Birtley by the Whitby Stone Company, these Iron works being the first on record furnished with the Ironstone now proved to extend from Whitby through Cleveland. Since the period alluded to, what a change ! — The Clarence Iron Works consist of five blast furnaces; they are situated at Port Clarence, on the Durham side of the Tees, nearly opposite to Middlesborough. The furnaces were erected 1854-5, principally for the smelting of Normanby (Cleveland) Ironstone, and are the property of Messrs. Bell Brothers — who are also proprietors of the Felling Iron Works, near Newcastle, where there are two blast furnaces, erected also in 1854-5, for the use of the Normanby and other Cleveland Ironstone. — Ferryhill Iron Works, situated 24 miles south of Newcastle, consist of two blast furnaces, the property of Mr. James Morrison, who intends using the Rosedale Iron ores. — The Darlington Iron Works, the property of the South Durham Iron Company, have three blast furnaces, which were erected in 185 4-7, for Hutton Low Cross and other Cleveland Ironstone. At the present time they are making a portion of their Iron from hematite ore exclusively, with a view of obtaining a quality of Iron of greater value than is commonly made in the district. The rolling mills situated near these Iron works belong to Mr. Wm. Barningham, and are capable of producing 20,000 tons of wrought Iron bars per annum. — Stockton Iron Works, consisting of three blast furnaces, erected in 1854-5, for Swainby and other Cleveland Ironstone, belong to Messrs. Holdsworth, Bennington, Byers & Co. — Witton Park Iron Works, situated in the Bishop-Auckland district, consist of four blast furnaces; they were erected in 1845-6, and intended to work the stone from the Coal and carboniferous limestone measures, using as a mixture the stone from Mrs. Clark's mines, near Whitby. The works, which include extensive rolling mills, &c., are the property of Messrs. Bolckow and Vaughan, and since their erection a town has sprung up at Witton Park. — Jarrow Iron Works, rolling mills, and extensive iron ship-building yards, have four blast furnaces erected on the south bank of the Tyne, about 7 miles below Newcastle; they belong Messrs. Palmer & Co., who are lessees of Ironstone in the Cleveland district, which they work and ship as required to the Tyne. — Norton Iron Works are situated near to Stockton; there are three blast furnaces, erected in 1856-8 — the Cleveland Ironstone is smelted. At these works the celebrated bell, the "Big Ben," for the Victoria Tower of Westminster, was cast. The works are the property of Messrs. Warners, Lucas and Barrett. — Seaham Iron Works, the property of the Marchioness of Londonderry, are situated at the harbour of Seaham, and consist of three blast furnaces in the course of completion. — The Wear and Washington Iron Works are contiguously situated near the village of Washington, about 6½ miles south-south-east from Newcastle. There is one blast furnace erected at each of the works; that at the Washington works in 1856, and the one at the Wear works mere recently. The Normanby and other Cleveland stone is used. The Washington works belong to the Washington Iron Company, and the Wear works to Messrs. Bells, Hawks & Co.
Tow Law Iron Works.
The works of "The Weardale Iron Company," constructed under the management of the resident partner, Charles Attwood, Esq., were begun in 1845, by the erection of one blast furnace at Stanhope. In 1846, this was followed by the erection of six others, at Tow Law, in a more suitable situation ; namely, at the point where the coal-field of the county of Durham terminates, in contact with the mountain limestone formation, in which latter are contained the deposits of Iron ore required for their supply. The ore is conveyed to the Iron works partly by the public line of railway connecting Tow Law with Stanhope, near which last mentioned place the mining field begins; and partly by a private branch from that railway, constructed by the Iron Company, and extending into Rookhope, which latter is at present being further prolonged by them into Middlehope. The mines of Ironstone become, about this latter place, much more numerous, larger, and of richer quality than in the immediate neighbourhood of Stanhope; and this superiority continues throughout nearly the whole length of Weardale westward, or for a further distance of about 15 miles.
The ore which these mines afford is found in the same veins as those out of which the lead ore of the district is wrought; although it is found, for the most part, that where the lead becomes the most abundant, the quantity of Iron ore diminishes; whilst where the Iron is more plentiful, the lead ore as frequently becomes more sparingly diffused.
The ore is met with not only in the veins themselves, but extends on one or both sides of them, by an expansion which is locally described as a "flatting out," or into "flats;" that is to say, into horizontal beds, for very variable distances from the cheeks, or sides, of the
Please Note: These web pages retain the original pagination from the publication