Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
History Subsection
Biography Subsection
Obituary Subsection
Newspaper Articles
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


Archives Prev Page Return to Index Next Page Archives
/   \

On the 16th January 1862 204 miners lost their lives when they were entombed at Hartley Colliery when the shaft was blocked after the engine beam broke and fell down the shaft — there was no other means of escape from the pit other than the blocked shaft. Following this the prevailing thought in the mining community was that each colliery should have a second means of egress in case of emergency. The Secretary of State wrote to all the Mines Inspectors requesting information on those collieries that only had a single means of escape. This is the reply from John J. Atkinson, Inspector of Mines for the South Durham District.

Mr. Atkinson to Sir G. Grey. — (Received February 26).

Bowburn, near Durham, 24 February 1862.

Sir,

I have the honour to forward you enclosed a return as to the shafts in the South Durham inspection district, as required by letters dated 24 January, 28 January, and 7 February, 1862, respectively.

I have, &c.

(signed) John J. Atkinson,

Inspector of Mines.

 

RETURN of PARTICULARS relative to the Single Bratticed and other Shafts in the South Durham Inspection District, called for by Her Majesty’s Secretary of State for the Home Department, in Letters dated 24th January, 28th January, and 7th February, 1862.

 

1. Particulars as to Single Bratticed Shafts in the South Durham Inspection District.

No. Name of the Colliery. Name of Seam in which Workings are carried on, that are accessible only through a Single Shaft, or other Single Communication. Depth or Distance over which such Single Shaft, or other Single Communication prevails. Nature of the Partition dividing such Single Shaft, or other Single Communication into Compartments. Area of the Compartments into which such Single Shaft or other Single Communication is divided and the purposes in Ventilation to which they are applied. Nature of Fires from which the Smoke and Heated Air ascend through the Upcast Compartment of such Single Shaft, or other Single Communication. Whether it is practicable to effect an Underground Communication with Adjacent Shafts so as to obtain the benefit of such Adjacent Shaft or other Communincation and if so, the probable Time and Cost of doing so. Whether it is practicahle to sink an additional Shaft; and if so, in what Time, and at what Cost.
Downcast Upcast Dumb or
Dormant
Reply Time Cost Reply Time Cost
      Yards   Superficial
Feet
Superficial
Feet
Superficial
Feet
    Months £   Months £
1 Witton Hutton 50 Timber Brattice 68½ 7½ None None Not at present - - Yes 4 300
2 Framwellgate Busty Bank 88 Ditto 14½ 56 Ditto Furnace No - - ,, 6 440
3 Nettlesworth Hutton 60 Ditto 71 15 Ditto None Not at present - - ,, 4 1,000
4 Belmont Low Main 80 Ditto 59 51 Ditto None as yet Ditto - - ,, 6 1,000
5 Rainton Plain Pit Hutton 30 Ditto 24 24 Ditto None Not before working will be finished. - -    
6 Ryhope Hutton and Maudlin 440 Ditto 90 80 Ditto Furnace and engine Yes 30 2,500 ,, 36 25,000
7 Adelaide’s Brockwell 344 Ditto 93 62 Ditto Furnace Yes 5 200 ,, 26 8,000
8 Black Boy Ditto 224 Ditto 95½ 34½ Ditto Ditto Yes 5 200 ,, 18 12,000
9 New Brancepeth Not known 63 Ditto 28 56 Ditto None No - - ,, 12 3,300
10 Cassop Vale Pit Main Coal and Five Quarter 108 Ditto 84 27 Ditto Furnace Yes 4 200 ,, 24 8,000
11 Castle Eden Low Main 204 Ditto 113 58 Ditto Furnace and boilers No - - ,, 36 8,000
12 Little Chilton Five Quarter 80 Ditto 77 30 Ditto Furnace Yes 18 1,500 ,, 4 250
13 Coxhoe Harvey 161 Ditto 63 70 70 None No - - ,, 21 9,000
14 Elm Park Little 36 Ditto 76 27 None Ditto Not at present - - ,, 2 180
15 Ludworth Main Coal 210 Ditto 46 46 40 Furnace Yes 30 2,500 ,, 18 5,000
16 Stanley, Pease’s Ditto 74 Ditto 66 34 None Ditto Not at present - - ,, 1 50
17 Tursdale Brockwell 118 Ditto 99 27 Ditto None No - - ,, 18 6,500
18 Shildon Lodge Ditto 160 Ditto 75 35 Ditto None as yet Yes 24 2,500 ,, 18 5,000
19 Howden Main Coal 27 Ditto 65 Ditto Ditto No - - ,, 2 50

 

Number of Collieries in the South Durham Inspection District, where workings are carried on, that are accessible only by means of a single bratticed shaft, or other single communication, as stated in the preceding List 19
Number of Collieries at which underground furnaces or other fires are used, but at which inure than one shaft is in existence 104
Number of Collieres at which underground furnaces or other fires are not used, and at which there are more than one shaft or other single communication between the surface of the earth and the working 18
Total Number of Collieries in the South Durham District   141

During the past three years no accidents have arisen from the falling in or obstruction of shafts in the South Durham Inspection District.

I think it is practicable and desirable to require that all workings in collieries and iron-stone mines, to which the general provisions of the Mines Regulation and Inspection Act apply, should be accessible by means of more than one shaft or other communication between them and the surface of the earth ; provided that workings being prosecuted at the time of such requirement being made he allowed to continue to be prosecuted on condition of’ active measures being constantly in operation to provide a second shaft or other second communication between such workings and the surface of the earth ; and, further, provided that, for the purpose of proving a mine, a single bratticed shaft may be used on condition of no more than twenty persons being employed in such mine at one and the same time,

24 February 1862.

John J. Atkinson, Inspector of Mines.

 

Prev Page Return to Top of Page Next Page

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 31 Dec 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print